OKX VVV perpetual
VVV-USDT-SWAP
As of 2026-10-01 00:32 UTC, VVV-USDT-SWAP on OKX has a collected rate of +0.0050% over 4h, or +10.95% simple annualised; its collected settlement interval is 4h, with up to 20x leverage. Bybit has a lower rate for longs at +4.72%.
Settled rates over the past 30 days
Settled funding for VVV-USDT-SWAP
The latest 30-day window contains 49 settlements covering 196 known-period hours, with a cumulative rate of +0.4014%. The latest 12 settlements are shown below.
| Settlement time (UTC) | Rate | Rate period |
|---|---|---|
| 2026-09-09 04:00 | +0.0050% | 4h |
| 2026-09-09 00:00 | +0.0050% | 4h |
| 2026-09-08 20:00 | +0.0050% | 4h |
| 2026-09-08 16:00 | +0.0179% | 4h |
| 2026-09-08 12:00 | +0.0180% | 4h |
| 2026-09-08 08:00 | +0.0107% | 4h |
| 2026-09-08 04:00 | +0.0179% | 4h |
| 2026-09-08 00:00 | +0.0309% | 4h |
| 2026-09-07 20:00 | +0.0052% | 4h |
| 2026-09-07 16:00 | +0.0050% | 4h |
| 2026-09-07 12:00 | +0.0050% | 4h |
| 2026-09-07 08:00 | +0.0050% | 4h |
The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.
What does this rate mean for a 10,000 USDT position?
For VVV-USDT-SWAP, 10,000 USDT of notional × 0.005000% gives 0.5000 USDT over the quoted 4h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.
How do I select the margin tier for VVV-USDT-SWAP?
This table selects tiers by base-asset quantity in VVV, not by the amount of margin deposited. The first tier starts at 0 and ends at 2000 VVV. Above that, tier 2 requires 3.0000% maintenance margin.
Contract units and calculator input
One VVV-USDT-SWAP contract represents 0.1 VVV. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.
Maintenance margin ladder
No deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.
| Tier | Range | Maintenance rate | Max leverage | Deduction |
|---|---|---|---|---|
| 1 | 0 – 2000 base | 2.0000% | 20.00x | — |
| 2 | 2000.1 – 4000 base | 3.0000% | 15.00x | — |
| 3 | 4000.1 – 6000 base | 4.0000% | 12.50x | — |
| 4 | 6000.1 – 8000 base | 4.5000% | 11.76x | — |
| 5 | 8000.1 – 10000 base | 5.0000% | 11.11x | — |
| 6 | 10000.1 – 12000 base | 5.5000% | 10.52x | — |
| 7 | 12000.1 – 14000 base | 6.0000% | 10.00x | — |
| 8 | 14000.1 – 16000 base | 6.5000% | 9.52x | — |
| 9 | 16000.1 – 18000 base | 7.0000% | 9.09x | — |
| 10 | 18000.1 – 20000 base | 7.5000% | 8.69x | — |
| 11 | 20000.1 – 22000 base | 8.0000% | 8.33x | — |
| 12 | 22000.1 – 24000 base | 8.5000% | 8.00x | — |
| 13 | 24000.1 – 26000 base | 9.0000% | 7.69x | — |
| 14 | 26000.1 – 28000 base | 9.5000% | 7.40x | — |
| 15 | 28000.1 – 30000 base | 10.0000% | 7.14x | — |
| 16 | 30000.1 – 32000 base | 10.5000% | 6.89x | — |
| 17 | 32000.1 – 34000 base | 11.0000% | 6.66x | — |
| 18 | 34000.1 – 36000 base | 11.5000% | 6.45x | — |
| 19 | 36000.1 – 38000 base | 12.0000% | 6.25x | — |
| 20 | 38000.1 – 40000 base | 12.5000% | 6.06x | — |
| 21 | 40000.1 – 42000 base | 13.0000% | 5.88x | — |
| 22 | 42000.1 – 44000 base | 13.5000% | 5.71x | — |
| 23 | 44000.1 – 46000 base | 14.0000% | 5.55x | — |
| 24 | 46000.1 – 48000 base | 14.5000% | 5.40x | — |
| 25 | 48000.1 – 50000 base | 15.0000% | 5.26x | — |
| 26 | 50000.1 – 52000 base | 15.5000% | 5.12x | — |
| 27 | 52000.1 – 54000 base | 16.0000% | 5.00x | — |
| 28 | 54000.1 – 56000 base | 16.5000% | 4.87x | — |
| 29 | 56000.1 – 58000 base | 17.0000% | 4.76x | — |
| 30 | 58000.1 – 60000 base | 17.5000% | 4.65x | — |
| 31 | 60000.1 – 62000 base | 18.0000% | 4.54x | — |
| 32 | 62000.1 – 64000 base | 18.5000% | 4.44x | — |
| 33 | 64000.1 – 66000 base | 19.0000% | 4.34x | — |
| 34 | 66000.1 – 68000 base | 19.5000% | 4.25x | — |
| 35 | 68000.1 – 70000 base | 20.0000% | 4.16x | — |
| 36 | 70000.1 – 72000 base | 20.5000% | 4.08x | — |
| 37 | 72000.1 – 74000 base | 21.0000% | 4.00x | — |
| 38 | 74000.1 – 76000 base | 21.5000% | 3.92x | — |
| 39 | 76000.1 – 78000 base | 22.0000% | 3.84x | — |
| 40 | 78000.1 – 80000 base | 22.5000% | 3.77x | — |
| 41 | 80000.1 – 82000 base | 23.0000% | 3.70x | — |
| 42 | 82000.1 – 84000 base | 23.5000% | 3.63x | — |
| 43 | 84000.1 – 86000 base | 24.0000% | 3.57x | — |
| 44 | 86000.1 – 88000 base | 24.5000% | 3.50x | — |
| 45 | 88000.1 – 90000 base | 25.0000% | 3.44x | — |
| 46 | 90000.1 – 92000 base | 25.5000% | 3.38x | — |
| 47 | 92000.1 – 94000 base | 26.0000% | 3.33x | — |
| 48 | 94000.1 – 96000 base | 26.5000% | 3.27x | — |
| 49 | 96000.1 – 98000 base | 27.0000% | 3.22x | — |
| 50 | 98000.1 – 100000 base | 27.5000% | 3.17x | — |
| 51 | 100000.1 – 102000 base | 28.0000% | 3.12x | — |
| 52 | 102000.1 – 104000 base | 28.5000% | 3.07x | — |
| 53 | 104000.1 – 106000 base | 29.0000% | 3.03x | — |
| 54 | 106000.1 – 108000 base | 29.5000% | 2.98x | — |
| 55 | 108000.1 – 110000 base | 30.0000% | 2.94x | — |
| 56 | 110000.1 – 112000 base | 30.5000% | 2.89x | — |
| 57 | 112000.1 – 114000 base | 31.0000% | 2.85x | — |
| 58 | 114000.1 – 116000 base | 31.5000% | 2.81x | — |
| 59 | 116000.1 – 118000 base | 32.0000% | 2.77x | — |
| 60 | 118000.1 – 120000 base | 32.5000% | 2.73x | — |
| 61 | 120000.1 – 122000 base | 33.0000% | 2.70x | — |
| 62 | 122000.1 – 124000 base | 33.5000% | 2.66x | — |
| 63 | 124000.1 – 126000 base | 34.0000% | 2.63x | — |
| 64 | 126000.1 – 128000 base | 34.5000% | 2.59x | — |
| 65 | 128000.1 – 130000 base | 35.0000% | 2.56x | — |
| 66 | 130000.1 – 132000 base | 35.5000% | 2.53x | — |
| 67 | 132000.1 – 134000 base | 36.0000% | 2.50x | — |
| 68 | 134000.1 – 136000 base | 36.5000% | 2.46x | — |
| 69 | 136000.1 – 138000 base | 37.0000% | 2.43x | — |
| 70 | 138000.1 – 140000 base | 37.5000% | 2.40x | — |
| 71 | 140000.1 – 142000 base | 38.0000% | 2.38x | — |
| 72 | 142000.1 – 144000 base | 38.5000% | 2.35x | — |
| 73 | 144000.1 – 146000 base | 39.0000% | 2.32x | — |
| 74 | 146000.1 – 148000 base | 39.5000% | 2.29x | — |
| 75 | 148000.1 – 150000 base | 40.0000% | 2.27x | — |
| 76 | 150000.1 – 152000 base | 40.5000% | 2.24x | — |
| 77 | 152000.1 – 154000 base | 41.0000% | 2.22x | — |
| 78 | 154000.1 – 156000 base | 41.5000% | 2.19x | — |
| 79 | 156000.1 – 158000 base | 42.0000% | 2.17x | — |
| 80 | 158000.1 – 160000 base | 42.5000% | 2.15x | — |
| 81 | 160000.1 – 162000 base | 43.0000% | 2.12x | — |
| 82 | 162000.1 – 164000 base | 43.5000% | 2.10x | — |
| 83 | 164000.1 – 166000 base | 44.0000% | 2.08x | — |
| 84 | 166000.1 – 168000 base | 44.5000% | 2.06x | — |
| 85 | 168000.1 – 170000 base | 45.0000% | 2.04x | — |
| 86 | 170000.1 – 172000 base | 45.5000% | 2.02x | — |
| 87 | 172000.1 – 174000 base | 46.0000% | 2.00x | — |
Contract specification
Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.
The same asset elsewhere
| Venue | Contract | Rate period | Annualised |
|---|---|---|---|
| Bybit | VVVUSDT | 4h | +4.72% |
| Gate | VVV_USDT | 4h | +8.32% |
| Aster | VVVUSDT | 4h | +10.95% |
| Binance | VVVUSDT | 4h | +10.95% |
| Bitget | VVVUSDT | 4h | +10.95% |
| Hyperliquid | VVV | 1h | +10.95% |
| OKX this page | VVV-USDT-SWAP | 4h | +10.95% |
| Lighter | VVV | 8h | +35.92% |
Common questions
What is the OKX VVV funding rate?
The latest collected OKX VVV funding rate is +0.0050% per 4h rate period, or +10.95% simple annualised. At this rate longs pay shorts.
How often is funding charged on OKX VVV?
The collected settlement interval is 4h, normally 6 times a day. Venues can change it; confirm the next settlement time on the contract page.
What is the maximum leverage on OKX VVV?
The collected leverage cap for OKX VVV is 20x, with 87 margin tiers shown. The first margin tier, up to 2000 VVV, allows 20x; the second allows 15x.
What is the maintenance margin rate on OKX VVV?
The first tier requires 2.0000%, with 87 available tiers. The applicable requirement depends on the position’s tier. This venue applies no deduction: maintenance margin = notional × the rate of the tier the position falls in.
Which venue has the lowest VVV funding cost for longs?
For a long position, Bybit currently has the lowest rate at +4.72% annualised; this page's OKX is at +10.95%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.
What has OKX VVV funding paid over the past 30 days?
Settlements over the past 30 days annualise to +17.94% across 49 settlements, 0% of which were negative (shorts paying). That is what already happened, not a forecast.
Observation time and verification
This contract’s funding was observed at 2026-10-01 00:32 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. OKX official data source · Funding methodology
History coverage for this contract
49 settlements are available, covering 196 known-period hours, from 2026-09-01 04:00 to 2026-09-09 04:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.
