English

Gate VVV perpetual

VVV_USDT

Use this contract in the calculator →

As of 2026-10-01 00:31 UTC, VVV_USDT on Gate has a collected rate of +0.0038% over 4h, or +8.32% simple annualised; its collected settlement interval is 4h, with up to 25x leverage. Bybit has a lower rate for longs at +4.72%.

Rate
+0.0038%
Rate period: 4h
Annualised
+8.32%
3.5M 24h turnover
Max leverage
25x
16 Tier
30d realised APR
+10.34%
49 settlements

Settled rates over the past 30 days

Annualised · +10.34% · range -10.7% … +11.0% · 49 settlements

Settled funding for VVV_USDT

The latest 30-day window contains 49 settlements covering 196 known-period hours, with a cumulative rate of +0.2314%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-09-09 04:00+0.0025%4h
2026-09-09 00:00+0.0050%4h
2026-09-08 20:00+0.0050%4h
2026-09-08 16:00+0.0050%4h
2026-09-08 12:00+0.0050%4h
2026-09-08 08:00+0.0050%4h
2026-09-08 04:00+0.0050%4h
2026-09-08 00:00+0.0050%4h
2026-09-07 20:00+0.0050%4h
2026-09-07 16:00+0.0050%4h
2026-09-07 12:00+0.0050%4h
2026-09-07 08:00+0.0050%4h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For VVV_USDT, 10,000 USDT of notional × 0.003800% gives 0.3800 USDT over the quoted 4h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for VVV_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 2.5000% maintenance margin.

Contract units and calculator input

One VVV_USDT contract represents 0.1 VVV. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 2.0000% 25.00x —
2 5000 – 10000 quote 2.5000% 20.00x 25
3 10000 – 20000 quote 3.0000% 18.00x 75
4 20000 – 50000 quote 4.0000% 15.00x 275
5 50000 – 100000 quote 4.5000% 12.00x 525
6 100000 – 150000 quote 5.0000% 10.00x 1025
7 150000 – 200000 quote 6.0000% 8.00x 2525
8 200000 – 500000 quote 8.0000% 6.60x 6525
9 500000 – 700000 quote 10.0000% 5.00x 16525
10 700000 – 1000000 quote 15.0000% 4.00x 51525
11 1000000 – 1500000 quote 25.0000% 3.00x 151525
12 1500000 – 2000000 quote 35.0000% 2.00x 301525
13 2000000 – 3000000 quote 50.0000% 1.50x 601525
14 3000000 – 4000000 quote 60.0000% 1.33x 901525
15 4000000 – 5000000 quote 70.0000% 1.20x 1301525
16 5000000 – ∞ quote 80.0000% 1.05x 1801525

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
VVV_USDT
Mark price
27.4980
Tick size
0.001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Bybit VVVUSDT 4h +4.72%
Gate this page VVV_USDT 4h +8.32%
Aster VVVUSDT 4h +10.95%
Binance VVVUSDT 4h +10.95%
Bitget VVVUSDT 4h +10.95%
Hyperliquid VVV 1h +10.95%
OKX VVV-USDT-SWAP 4h +10.95%
Lighter VVV 8h +35.92%

VVV By venue →

Common questions

What is the Gate VVV funding rate?

The latest collected Gate VVV funding rate is +0.0038% per 4h rate period, or +8.32% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate VVV?

The collected settlement interval is 4h, normally 6 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate VVV?

The collected leverage cap for Gate VVV is 25x, with 16 margin tiers shown. The first margin tier, up to 5K USDT, allows 25x; the second allows 20x.

What is the maintenance margin rate on Gate VVV?

The first tier requires 2.0000%, with 16 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Which venue has the lowest VVV funding cost for longs?

For a long position, Bybit currently has the lowest rate at +4.72% annualised; this page's Gate is at +8.32%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

What has Gate VVV funding paid over the past 30 days?

Settlements over the past 30 days annualise to +10.34% across 49 settlements, 2% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-10-01 00:31 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology

History coverage for this contract

49 settlements are available, covering 196 known-period hours, from 2026-09-01 04:00 to 2026-09-09 04:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.