English

Aster SOXL perpetual

SOXLUSDT

Use this contract in the calculator →

As of 2026-10-21 21:24 UTC, SOXLUSDT on Aster has a collected rate of 0.0000% over 8h, or 0.00% simple annualised; its collected settlement interval is 8h, with up to 50x leverage.

Rate
0.0000%
Rate period: 8h
Annualised
0.00%
5.3M 24h turnover
Max leverage
50x
8 Tier
30d realised APR
+1.11%
90 settlements

Settled rates over the past 30 days

Annualised · +1.11% · range -231.6% … +507.7% · 90 settlements

Settled funding for SOXLUSDT

The latest 30-day window contains 90 settlements covering 720 known-period hours, with a cumulative rate of +0.0913%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-10-21 16:000.0000%8h
2026-10-21 08:00-0.2115%8h
2026-10-21 00:000.0000%8h
2026-10-20 16:00+0.0028%8h
2026-10-20 08:00+0.0018%8h
2026-10-20 00:00+0.0097%8h
2026-10-19 16:000.0000%8h
2026-10-19 08:000.0000%8h
2026-10-19 00:00+0.4636%8h
2026-10-18 16:00-0.1263%8h
2026-10-18 08:000.0000%8h
2026-10-18 00:00-0.0778%8h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For SOXLUSDT, 10,000 USDT of notional × 0.000000% gives 0.0000 USDT over the quoted 8h rate period: neither side pays funding at this rate. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for SOXLUSDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 1000000 USDT. Above that, tier 2 requires 2.5000% maintenance margin.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 1000000 quote 1.5000% 50.00x —
2 1000000 – 5000000 quote 2.5000% 20.00x 10000
3 5000000 – 10000000 quote 5.0000% 10.00x 135000
4 10000000 – 20000000 quote 10.0000% 5.00x 635000
5 20000000 – 30000000 quote 12.5000% 4.00x 1135000
6 30000000 – 40000000 quote 16.6700% 3.00x 2386000
7 40000000 – 100000000 quote 25.0000% 2.00x 5718000
8 100000000 – 1000000000 quote 50.0000% 1.00x 30718000

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h (00:00 · 08:00 · 16:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
SOXLUSDT
Mark price
102.1800
Tick size
0.01
Lot size
0.01
Min notional
5

The same asset elsewhere

Venue Contract Rate period Annualised
Aster SOXLUSD1 8h 0.00%
Aster this page SOXLUSDT 8h 0.00%
Bybit SOXLUSDT 8h 0.00%
Gate SOXL_USDT 8h 0.00%
OKX SOXL-USDT-SWAP 8h 0.00%
Bitget SOXLUSDT 8h +2.85%
Lighter SOXL 8h +12.26%

SOXL By venue →

Common questions

What is the Aster SOXL funding rate?

The latest collected Aster SOXL funding rate is 0.0000% per 8h rate period, or 0.00% simple annualised.

How often is funding charged on Aster SOXL?

The collected settlement interval is 8h, normally 3 times a day. Settlements fall at 00:00, 08:00 and 16:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Aster SOXL?

The collected leverage cap for Aster SOXL is 50x, with 8 margin tiers shown. The first margin tier, up to 1M USDT, allows 50x; the second allows 20x.

What is the maintenance margin rate on Aster SOXL?

The first tier requires 1.5000%, with 8 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

What has Aster SOXL funding paid over the past 30 days?

Settlements over the past 30 days annualise to +1.11% across 90 settlements, 21% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-10-21 21:24 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Aster official data source · Funding methodology

History coverage for this contract

90 settlements are available, covering 720 known-period hours, from 2026-09-22 00:00 to 2026-10-21 16:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.