English

Gate POL perpetual

POL_USDT

Use this contract in the calculator →

As of 2026-11-04 08:47 UTC, POL_USDT on Gate has a collected rate of +0.0050% over 4h, or +10.95% simple annualised; its collected settlement interval is 4h, with up to 75x leverage. Aster has a lower rate for longs at +1.78%.

Rate
+0.0050%
Rate period: 4h
Annualised
+10.95%
934.4K 24h turnover
Max leverage
75x
22 Tier
30d realised APR
+0.84%
105 settlements

Settled rates over the past 30 days

Annualised · +0.84% · range -27.6% … +11.0% · 105 settlements

Settled funding for POL_USDT

The latest 30-day window contains 105 settlements covering 420 known-period hours, with a cumulative rate of +0.0404%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-10-22 20:00-0.0090%4h
2026-10-22 16:00-0.0048%4h
2026-10-22 12:00-0.0041%4h
2026-10-22 08:00-0.0079%4h
2026-10-22 04:00+0.0050%4h
2026-10-22 00:00+0.0014%4h
2026-10-21 20:00+0.0006%4h
2026-10-21 16:00+0.0050%4h
2026-10-21 12:00-0.0017%4h
2026-10-21 08:00+0.0018%4h
2026-10-21 04:00-0.0032%4h
2026-10-21 00:00-0.0038%4h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For POL_USDT, 10,000 USDT of notional × 0.005000% gives 0.5000 USDT over the quoted 4h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for POL_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 20000 USDT. Above that, tier 2 requires 0.7000% maintenance margin.

Contract units and calculator input

One POL_USDT contract represents 10 POL. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 20000 quote 0.6500% 75.00x —
2 20000 – 30000 quote 0.7000% 70.00x 10
3 30000 – 40000 quote 0.7500% 66.00x 25
4 40000 – 50000 quote 0.8000% 60.00x 45
5 50000 – 70000 quote 0.9000% 55.00x 95
6 70000 – 100000 quote 1.0000% 50.00x 165
7 100000 – 150000 quote 1.5000% 40.00x 665
8 150000 – 200000 quote 2.0000% 33.00x 1415
9 200000 – 250000 quote 2.3000% 30.00x 2015
10 250000 – 300000 quote 2.5000% 25.00x 2515
11 300000 – 350000 quote 3.0000% 22.00x 4015
12 350000 – 400000 quote 3.5000% 20.00x 5765
13 400000 – 450000 quote 4.0000% 18.00x 7765
14 450000 – 500000 quote 5.5000% 15.00x 14515
15 500000 – 700000 quote 6.5000% 12.50x 19515
16 700000 – 1000000 quote 8.0000% 10.00x 30015
17 1000000 – 1500000 quote 18.0000% 5.00x 130015
18 1500000 – 2000000 quote 30.0000% 3.00x 310015
19 2000000 – 2500000 quote 45.0000% 2.00x 610015
20 2500000 – 3000000 quote 75.0000% 1.25x 1360015
21 3000000 – 4000000 quote 85.0000% 1.10x 1660015
22 4000000 – ∞ quote 90.0000% 1.05x 1860015

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h (00:00 · 04:00 · 08:00 · 12:00 · 16:00 · 20:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
POL_USDT
Mark price
0.0939
Tick size
0.00001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Aster POLUSDT 4h +1.78%
Lighter POL 8h +10.51%
Binance POLUSDT 4h +10.95%
Bitget POLUSDT 4h +10.95%
Bybit POLPERP 8h +10.95%
Bybit POLUSDT 4h +10.95%
Gate this page POL_USDT 4h +10.95%
Hyperliquid POL 1h +10.95%
OKX POL-USDT-SWAP 4h +10.95%

POL By venue →

Common questions

What is the Gate POL funding rate?

The latest collected Gate POL funding rate is +0.0050% per 4h rate period, or +10.95% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate POL?

The collected settlement interval is 4h, normally 6 times a day. Settlements fall at 00:00, 04:00, 08:00, 12:00, 16:00 and 20:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Gate POL?

The collected leverage cap for Gate POL is 75x, with 22 margin tiers shown. The first margin tier, up to 20K USDT, allows 75x; the second allows 70x.

What is the maintenance margin rate on Gate POL?

The first tier requires 0.6500%, with 22 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Which venue has the lowest POL funding cost for longs?

For a long position, Aster currently has the lowest rate at +1.78% annualised; this page's Gate is at +10.95%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

What has Gate POL funding paid over the past 30 days?

Settlements over the past 30 days annualise to +0.84% across 105 settlements, 38% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-11-04 08:47 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology

History coverage for this contract

105 settlements are available, covering 420 known-period hours, from 2026-10-05 12:00 to 2026-10-22 20:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.