English

Bybit POL perpetual

POLUSDT

Use this contract in the calculator →

As of 2026-10-01 02:05 UTC, POLUSDT on Bybit has a collected rate of +0.0026% over 4h, or +5.66% simple annualised; its collected settlement interval is 4h, with up to 75x leverage. Aster has a lower rate for longs at -43.06%.

Rate
+0.0026%
Rate period: 4h
Annualised
+5.66%
9.8M 24h turnover
Max leverage
75x
30 Tier
30d realised APR
+3.11%
49 settlements

Settled rates over the past 30 days

Annualised · +3.11% · range -39.5% … +11.0% · 49 settlements

Settled funding for POLUSDT

The latest 30-day window contains 49 settlements covering 196 known-period hours, with a cumulative rate of +0.0695%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-09-09 04:00+0.0050%4h
2026-09-09 00:00+0.0050%4h
2026-09-08 20:00+0.0050%4h
2026-09-08 16:00+0.0050%4h
2026-09-08 12:00+0.0050%4h
2026-09-08 08:00+0.0050%4h
2026-09-08 04:00+0.0050%4h
2026-09-08 00:00+0.0032%4h
2026-09-07 20:00-0.0074%4h
2026-09-07 16:00-0.0180%4h
2026-09-07 12:00+0.0050%4h
2026-09-07 08:00+0.0009%4h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For POLUSDT, 10,000 USDT of notional × 0.002586% gives 0.2586 USDT over the quoted 4h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for POLUSDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 1.5000% maintenance margin.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 1.0000% 75.00x —
2 5000 – 25000 quote 1.5000% 50.00x 25
3 25000 – 50000 quote 1.7500% 33.00x 87.5
4 50000 – 100000 quote 2.0000% 25.00x 212.5
5 100000 – 150000 quote 2.5000% 20.00x 712.5
6 150000 – 200000 quote 2.6300% 19.00x 907.5
7 200000 – 250000 quote 2.7800% 18.00x 1207.5
8 250000 – 300000 quote 2.9400% 17.00x 1607.5
9 300000 – 350000 quote 3.1300% 16.00x 2177.5
10 350000 – 400000 quote 3.3300% 15.00x 2877.5
11 400000 – 450000 quote 3.5700% 14.00x 3837.5
12 450000 – 500000 quote 3.8500% 13.00x 5097.5
13 500000 – 550000 quote 4.1700% 12.00x 6697.5
14 550000 – 600000 quote 4.5500% 11.00x 8787.5
15 600000 – 700000 quote 5.0000% 10.00x 11487.5
16 700000 – 800000 quote 5.5600% 9.00x 15407.5
17 800000 – 900000 quote 5.8800% 8.50x 17967.5
18 900000 – 1000000 quote 6.2500% 8.00x 21297.5
19 1000000 – 1500000 quote 6.6700% 7.50x 25497.5
20 1500000 – 2000000 quote 7.1400% 7.00x 32547.5
21 2000000 – 2500000 quote 7.6900% 6.50x 43547.5
22 2500000 – 3000000 quote 8.3300% 6.00x 59547.5
23 3000000 – 3500000 quote 9.0900% 5.50x 82347.5
24 3500000 – 4000000 quote 10.0000% 5.00x 114197.5
25 4000000 – 4500000 quote 11.1100% 4.50x 158597.5
26 4500000 – 5000000 quote 12.5000% 4.00x 221147.5
27 5000000 – 6000000 quote 14.2900% 3.50x 310647.5
28 6000000 – 7000000 quote 16.6700% 3.00x 453447.5
29 7000000 – 8000000 quote 20.0000% 2.50x 686547.5
30 8000000 – ∞ quote 25.0000% 2.00x 1086547.5

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
POLUSDT
Mark price
0.1122
Tick size
0.00001
Lot size
1
Min notional
5

The same asset elsewhere

Venue Contract Rate period Annualised
Aster POLUSDT 4h -43.06%
OKX POL-USDT-SWAP 4h -21.81%
Binance POLUSDT 4h -15.24%
Bybit this page POLUSDT 4h +5.66%
Lighter POL 8h +10.51%
Bitget POLUSDT 4h +10.95%
Bybit POLPERP 8h +10.95%
Gate POL_USDT 4h +10.95%
Hyperliquid POL 1h +10.95%

POL By venue →

Common questions

What is the Bybit POL funding rate?

The latest collected Bybit POL funding rate is +0.0026% per 4h rate period, or +5.66% simple annualised. At this rate longs pay shorts.

How often is funding charged on Bybit POL?

The collected settlement interval is 4h, normally 6 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Bybit POL?

The collected leverage cap for Bybit POL is 75x, with 30 margin tiers shown. The first margin tier, up to 5K USDT, allows 75x; the second allows 50x.

What is the maintenance margin rate on Bybit POL?

The first tier requires 1.0000%, with 30 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Which venue has the lowest POL funding cost for longs?

For a long position, Aster currently has the lowest rate at -43.06% annualised; this page's Bybit is at +5.66%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

What has Bybit POL funding paid over the past 30 days?

Settlements over the past 30 days annualise to +3.11% across 49 settlements, 24% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-10-01 02:05 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Bybit official data source · Funding methodology

History coverage for this contract

49 settlements are available, covering 196 known-period hours, from 2026-09-01 04:00 to 2026-09-09 04:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.