English

Gate IBM perpetual

IBM_USDT

Use this contract in the calculator →

As of 2026-10-05 05:39 UTC, IBM_USDT on Gate has a collected rate of 0.0000% over 8h, or 0.00% simple annualised; its collected settlement interval is 8h, with up to 50x leverage.

Rate
0.0000%
Rate period: 8h
Annualised
0.00%
448.6K 24h turnover
Max leverage
50x
17 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For IBM_USDT, 10,000 USDT of notional × 0.000000% gives 0.0000 USDT over the quoted 8h rate period: neither side pays funding at this rate. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for IBM_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 1.5000% maintenance margin.

Contract units and calculator input

One IBM_USDT contract represents 0.01 IBM. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 1.0000% 50.00x —
2 5000 – 10000 quote 1.5000% 40.00x 25
3 10000 – 20000 quote 2.5000% 25.00x 125
4 20000 – 50000 quote 3.5000% 20.00x 325
5 50000 – 100000 quote 4.5000% 16.00x 825
6 100000 – 150000 quote 6.5000% 12.00x 2825
7 150000 – 200000 quote 8.0000% 10.00x 5075
8 200000 – 500000 quote 10.0000% 8.00x 9075
9 500000 – 700000 quote 12.0000% 6.60x 19075
10 700000 – 1000000 quote 15.0000% 5.00x 40075
11 1000000 – 1500000 quote 20.0000% 4.00x 90075
12 1500000 – 2000000 quote 28.0000% 3.00x 210075
13 2000000 – 2500000 quote 35.0000% 2.50x 350075
14 2500000 – 3000000 quote 45.0000% 2.00x 600075
15 3000000 – 4000000 quote 60.0000% 1.50x 1050075
16 4000000 – 5000000 quote 78.0000% 1.20x 1770075
17 5000000 – ∞ quote 90.0000% 1.05x 2370075

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h (00:00 · 08:00 · 16:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
IBM_USDT
Mark price
222.5400
Tick size
0.01
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Aster IBMUSDT 8h 0.00%
Bitget IBMUSDT 8h 0.00%
Bybit IBMUSDT 8h 0.00%
Gate this page IBM_USDT 8h 0.00%
OKX IBM-USDT-SWAP 8h 0.00%
Lighter IBM 8h +3.50%

IBM By venue →

Common questions

What is the Gate IBM funding rate?

The latest collected Gate IBM funding rate is 0.0000% per 8h rate period, or 0.00% simple annualised.

How often is funding charged on Gate IBM?

The collected settlement interval is 8h, normally 3 times a day. Settlements fall at 00:00, 08:00 and 16:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Gate IBM?

The collected leverage cap for Gate IBM is 50x, with 17 margin tiers shown. The first margin tier, up to 5K USDT, allows 50x; the second allows 40x.

What is the maintenance margin rate on Gate IBM?

The first tier requires 1.0000%, with 17 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Observation time and verification

This contract’s funding was observed at 2026-10-05 05:39 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology