English

Bitget IBM perpetual

IBMUSDT

Use this contract in the calculator →

As of 2026-10-05 05:39 UTC, IBMUSDT on Bitget has a collected rate of 0.0000% over 8h, or 0.00% simple annualised; its collected settlement interval is 8h, with up to 20x leverage.

Rate
0.0000%
Rate period: 8h
Annualised
0.00%
288.4K 24h turnover
Max leverage
20x
8 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For IBMUSDT, 10,000 USDT of notional × 0.000000% gives 0.0000 USDT over the quoted 8h rate period: neither side pays funding at this rate. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for IBMUSDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 100000 USDT. Above that, tier 2 requires 4.0000% maintenance margin.

Contract units and calculator input

One IBMUSDT contract represents 1 IBM. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

No deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 100000 quote 2.5000% 20.00x —
2 100000 – 500000 quote 4.0000% 15.00x —
3 500000 – 2000000 quote 5.0000% 10.00x —
4 2000000 – 5000000 quote 12.0000% 5.00x —
5 5000000 – 10000000 quote 15.0000% 4.00x —
6 10000000 – 25000000 quote 20.0000% 3.00x —
7 25000000 – 50000000 quote 30.0000% 2.00x —
8 50000000 – ∞ quote 50.0000% 1.00x —

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h (00:00 · 08:00 · 16:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
IBMUSDT
Mark price
222.5800
Tick size
0.01
Lot size
0.01
Min notional
5

The same asset elsewhere

Venue Contract Rate period Annualised
Aster IBMUSDT 8h 0.00%
Bitget this page IBMUSDT 8h 0.00%
Bybit IBMUSDT 8h 0.00%
Gate IBM_USDT 8h 0.00%
OKX IBM-USDT-SWAP 8h 0.00%
Lighter IBM 8h +3.50%

IBM By venue →

Common questions

What is the Bitget IBM funding rate?

The latest collected Bitget IBM funding rate is 0.0000% per 8h rate period, or 0.00% simple annualised.

How often is funding charged on Bitget IBM?

The collected settlement interval is 8h, normally 3 times a day. Settlements fall at 00:00, 08:00 and 16:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Bitget IBM?

The collected leverage cap for Bitget IBM is 20x, with 8 margin tiers shown. The first margin tier, up to 100K USDT, allows 20x; the second allows 15x.

What is the maintenance margin rate on Bitget IBM?

The first tier requires 2.5000%, with 8 available tiers. The applicable requirement depends on the position’s tier. This venue applies no deduction: maintenance margin = notional × the rate of the tier the position falls in.

Observation time and verification

This contract’s funding was observed at 2026-10-05 05:39 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Bitget official data source · Funding methodology