English

OKX H100 perpetual

H100-USDT-SWAP

Use this contract in the calculator →

As of 2026-10-15 04:55 UTC, H100-USDT-SWAP on OKX has a collected rate of -0.6988% over 4h, or -1530.45% simple annualised; its collected settlement interval is 4h, with up to 3x leverage.

Rate
-0.6988%
Rate period: 4h
Annualised
-1530.45%
732.1K 24h turnover
Max leverage
3x
11 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For H100-USDT-SWAP, 10,000 USDT of notional × -0.698837% gives 69.8837 USDT over the quoted 4h rate period: longs receive and shorts pay. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for H100-USDT-SWAP?

This table selects tiers by base-asset quantity in H100, not by the amount of margin deposited. The first tier starts at 0 and ends at 3200 H100. Above that, tier 2 requires 13.0000% maintenance margin.

Contract units and calculator input

One H100-USDT-SWAP contract represents 1 H100. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

No deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 3200 base 10.0000% 3.00x —
2 3201 – 6000 base 13.0000% 2.86x —
3 6001 – 12000 base 18.0000% 2.50x —
4 12001 – 22000 base 20.0000% 2.38x —
5 22001 – 32000 base 22.0000% 2.27x —
6 32001 – 42000 base 24.0000% 2.17x —
7 42001 – 52000 base 26.0000% 2.08x —
8 52001 – 62000 base 28.0000% 2.00x —
9 62001 – 72000 base 30.0000% 1.92x —
10 72001 – 82000 base 32.0000% 1.85x —
11 82001 – 92000 base 34.0000% 1.79x —

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h (00:00 · 04:00 · 08:00 · 12:00 · 16:00 · 20:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
H100-USDT-SWAP
Mark price
3.3354
Tick size
0.0001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
OKX this page H100-USDT-SWAP 4h -1530.45%
Bitget H100USDT 8h 0.00%
Gate H100_USDT 8h 0.00%
Lighter H100 8h +3.50%

H100 By venue →

Common questions

What is the OKX H100 funding rate?

The latest collected OKX H100 funding rate is -0.6988% per 4h rate period, or -1530.45% simple annualised. At this rate shorts pay longs.

How often is funding charged on OKX H100?

The collected settlement interval is 4h, normally 6 times a day. Settlements fall at 00:00, 04:00, 08:00, 12:00, 16:00 and 20:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on OKX H100?

The collected leverage cap for OKX H100 is 3x, with 11 margin tiers shown. The first margin tier, up to 3200 H100, allows 3x; the second allows 3x.

What is the maintenance margin rate on OKX H100?

The first tier requires 10.0000%, with 11 available tiers. The applicable requirement depends on the position’s tier. This venue applies no deduction: maintenance margin = notional × the rate of the tier the position falls in.

Observation time and verification

This contract’s funding was observed at 2026-10-15 04:55 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. OKX official data source · Funding methodology