English

Gate ZBCN perpetual

ZBCN_USDT

Use this contract in the calculator →

As of 2026-10-01 02:05 UTC, ZBCN_USDT on Gate has a collected rate of -0.0356% over 4h, or -77.96% simple annualised; its collected settlement interval is 4h, with up to 20x leverage. Bybit has a lower rate for longs at -361.06%.

Rate
-0.0356%
Rate period: 4h
Annualised
-77.96%
154.4K 24h turnover
Max leverage
20x
17 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For ZBCN_USDT, 10,000 USDT of notional × -0.035600% gives 3.5600 USDT over the quoted 4h rate period: longs receive and shorts pay. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for ZBCN_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 5.0000% maintenance margin.

Contract units and calculator input

One ZBCN_USDT contract represents 1000 ZBCN. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 4.0000% 20.00x —
2 5000 – 7000 quote 5.0000% 15.00x 50
3 7000 – 10000 quote 6.5000% 12.00x 155
4 10000 – 15000 quote 8.0000% 10.00x 305
5 15000 – 20000 quote 9.0000% 9.00x 455
6 20000 – 30000 quote 10.0000% 8.00x 655
7 30000 – 50000 quote 12.0000% 7.00x 1255
8 50000 – 70000 quote 14.0000% 6.00x 2255
9 70000 – 100000 quote 16.0000% 5.00x 3655
10 100000 – 150000 quote 20.0000% 4.00x 7655
11 150000 – 200000 quote 24.0000% 3.50x 13655
12 200000 – 300000 quote 28.0000% 3.00x 21655
13 300000 – 500000 quote 35.0000% 2.50x 42655
14 500000 – 700000 quote 45.0000% 2.00x 92655
15 700000 – 1000000 quote 60.0000% 1.50x 197655
16 1000000 – 1500000 quote 78.0000% 1.20x 377655
17 1500000 – ∞ quote 90.0000% 1.05x 557655

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
ZBCN_USDT
Mark price
0.0029
Tick size
0.0000001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Bybit ZBCNUSDT 8h -361.06%
Gate this page ZBCN_USDT 4h -77.96%

ZBCN By venue →

Common questions

What is the Gate ZBCN funding rate?

The latest collected Gate ZBCN funding rate is -0.0356% per 4h rate period, or -77.96% simple annualised. At this rate shorts pay longs.

How often is funding charged on Gate ZBCN?

The collected settlement interval is 4h, normally 6 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate ZBCN?

The collected leverage cap for Gate ZBCN is 20x, with 17 margin tiers shown. The first margin tier, up to 5K USDT, allows 20x; the second allows 15x.

What is the maintenance margin rate on Gate ZBCN?

The first tier requires 4.0000%, with 17 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Which venue has the lowest ZBCN funding cost for longs?

For a long position, Bybit currently has the lowest rate at -361.06% annualised; this page's Gate is at -77.96%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

Observation time and verification

This contract’s funding was observed at 2026-10-01 02:05 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology