English

Gate XCU perpetual

XCU_USDT

Use this contract in the calculator →

As of 2026-10-15 05:57 UTC, XCU_USDT on Gate has a collected rate of 0.0000% over 8h, or 0.00% simple annualised; its collected settlement interval is 8h, with up to 100x leverage.

Rate
0.0000%
Rate period: 8h
Annualised
0.00%
341.1K 24h turnover
Max leverage
100x
14 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For XCU_USDT, 10,000 USDT of notional × 0.000000% gives 0.0000 USDT over the quoted 8h rate period: neither side pays funding at this rate. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for XCU_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 10000 USDT. Above that, tier 2 requires 0.7500% maintenance margin.

Contract units and calculator input

One XCU_USDT contract represents 1 XCU. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 10000 quote 0.5000% 100.00x —
2 10000 – 20000 quote 0.7500% 75.00x 25
3 20000 – 50000 quote 1.0000% 50.00x 75
4 50000 – 70000 quote 1.5000% 40.00x 325
5 70000 – 100000 quote 2.0000% 25.00x 675
6 100000 – 200000 quote 3.0000% 20.00x 1675
7 200000 – 300000 quote 5.0000% 10.00x 5675
8 300000 – 500000 quote 8.0000% 7.50x 14675
9 500000 – 700000 quote 10.0000% 5.00x 24675
10 700000 – 1000000 quote 20.0000% 3.00x 94675
11 1000000 – 2000000 quote 30.0000% 2.00x 194675
12 2000000 – 3000000 quote 40.0000% 1.50x 394675
13 3000000 – 4000000 quote 60.0000% 1.20x 994675
14 4000000 – ∞ quote 80.0000% 1.05x 1794675

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h (00:00 · 08:00 · 16:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
XCU_USDT
Mark price
6.5700
Tick size
0.001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Aster XCUUSDT 4h 0.00%
Gate this page XCU_USDT 8h 0.00%
OKX XCU-USDT-SWAP 8h 0.00%
Lighter XCU 8h +28.03%

XCU By venue →

Common questions

What is the Gate XCU funding rate?

The latest collected Gate XCU funding rate is 0.0000% per 8h rate period, or 0.00% simple annualised.

How often is funding charged on Gate XCU?

The collected settlement interval is 8h, normally 3 times a day. Settlements fall at 00:00, 08:00 and 16:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Gate XCU?

The collected leverage cap for Gate XCU is 100x, with 14 margin tiers shown. The first margin tier, up to 10K USDT, allows 100x; the second allows 75x.

What is the maintenance margin rate on Gate XCU?

The first tier requires 0.5000%, with 14 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Observation time and verification

This contract’s funding was observed at 2026-10-15 05:57 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology