English

Gate TW88 perpetual

TW88_USDT

Use this contract in the calculator →

As of 2026-11-10 23:29 UTC, TW88_USDT on Gate has a collected rate of 0.0000% over 8h, or 0.00% simple annualised; its collected settlement interval is 8h, with up to 50x leverage.

Rate
0.0000%
Rate period: 8h
Annualised
0.00%
22.1K 24h turnover
Max leverage
50x
15 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For TW88_USDT, 10,000 USDT of notional × 0.000000% gives 0.0000 USDT over the quoted 8h rate period: neither side pays funding at this rate. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for TW88_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 1.2500% maintenance margin.

Contract units and calculator input

One TW88_USDT contract represents 0.001 TW88. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 1.0000% 50.00x —
2 5000 – 10000 quote 1.2500% 40.00x 12.5
3 10000 – 20000 quote 1.5000% 30.00x 37.5
4 20000 – 30000 quote 2.0000% 25.00x 137.5
5 30000 – 50000 quote 2.5000% 20.00x 287.5
6 50000 – 70000 quote 3.5000% 15.00x 787.5
7 70000 – 100000 quote 5.0000% 10.00x 1837.5
8 100000 – 200000 quote 6.5000% 8.00x 3337.5
9 200000 – 300000 quote 8.0000% 6.00x 6337.5
10 300000 – 500000 quote 10.0000% 5.00x 12337.5
11 500000 – 1000000 quote 15.0000% 4.00x 37337.5
12 1000000 – 1500000 quote 20.0000% 3.00x 87337.5
13 1500000 – 2000000 quote 25.0000% 2.00x 162337.5
14 2000000 – 2500000 quote 40.0000% 1.50x 462337.5
15 2500000 – ∞ quote 70.0000% 1.05x 1212337.5

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h (00:00 · 08:00 · 16:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
TW88_USDT
Mark price
3627.2700
Tick size
0.01
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Gate this page TW88_USDT 8h 0.00%

TW88 By venue →

Common questions

What is the Gate TW88 funding rate?

The latest collected Gate TW88 funding rate is 0.0000% per 8h rate period, or 0.00% simple annualised.

How often is funding charged on Gate TW88?

The collected settlement interval is 8h, normally 3 times a day. Settlements fall at 00:00, 08:00 and 16:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Gate TW88?

The collected leverage cap for Gate TW88 is 50x, with 15 margin tiers shown. The first margin tier, up to 5K USDT, allows 50x; the second allows 40x.

What is the maintenance margin rate on Gate TW88?

The first tier requires 1.0000%, with 15 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Observation time and verification

This contract’s funding was observed at 2026-11-10 23:29 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology