English

Gate TIA perpetual

TIA_USDT

Use this contract in the calculator →

As of 2026-10-15 05:10 UTC, TIA_USDT on Gate has a collected rate of +0.0005% over 4h, or +1.10% simple annualised; its collected settlement interval is 4h, with up to 75x leverage. OKX has a lower rate for longs at -12.25%.

Rate
+0.0005%
Rate period: 4h
Annualised
+1.10%
4.5M 24h turnover
Max leverage
75x
20 Tier
30d realised APR
+4.71%
179 settlements

Settled rates over the past 30 days

Annualised · +4.71% · range -51.7% … +11.0% · 179 settlements

Settled funding for TIA_USDT

The latest 30-day window contains 179 settlements covering 716 known-period hours, with a cumulative rate of +0.3851%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-10-15 00:00-0.0017%4h
2026-10-14 20:00+0.0037%4h
2026-10-14 16:00+0.0050%4h
2026-10-14 12:00+0.0012%4h
2026-10-14 08:00+0.0050%4h
2026-10-14 04:00+0.0016%4h
2026-10-14 00:00+0.0050%4h
2026-10-13 20:00+0.0050%4h
2026-10-13 16:00+0.0016%4h
2026-10-13 12:00-0.0236%4h
2026-10-13 08:00-0.0041%4h
2026-10-13 04:00-0.0089%4h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For TIA_USDT, 10,000 USDT of notional × 0.000500% gives 0.0500 USDT over the quoted 4h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for TIA_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 10000 USDT. Above that, tier 2 requires 0.9000% maintenance margin.

Contract units and calculator input

One TIA_USDT contract represents 1 TIA. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 10000 quote 0.8333% 75.00x —
2 10000 – 20000 quote 0.9000% 60.00x 6.67
3 20000 – 30000 quote 1.0000% 50.00x 26.67
4 30000 – 50000 quote 1.2500% 40.00x 101.67
5 50000 – 70000 quote 1.5000% 35.00x 226.67
6 70000 – 100000 quote 2.0000% 30.00x 576.67
7 100000 – 200000 quote 2.5000% 25.00x 1076.67
8 200000 – 300000 quote 3.5000% 20.00x 3076.67
9 300000 – 500000 quote 5.0000% 12.00x 7576.67
10 500000 – 700000 quote 6.5000% 10.00x 15076.67
11 700000 – 1000000 quote 10.0000% 8.00x 39576.67
12 1000000 – 1500000 quote 12.0000% 6.60x 59576.67
13 1500000 – 2000000 quote 15.0000% 5.00x 104576.67
14 2000000 – 3000000 quote 20.0000% 4.00x 204576.67
15 3000000 – 5000000 quote 25.0000% 3.00x 354576.67
16 5000000 – 7000000 quote 35.0000% 2.00x 854576.67
17 7000000 – 10000000 quote 45.0000% 1.80x 1554576.67
18 10000000 – 15000000 quote 50.0000% 1.50x 2054576.67
19 15000000 – 20000000 quote 60.0000% 1.20x 3554576.67
20 20000000 – ∞ quote 80.0000% 1.05x 7554576.67

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h (00:00 · 04:00 · 08:00 · 12:00 · 16:00 · 20:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
TIA_USDT
Mark price
0.5326
Tick size
0.0001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
OKX TIA-USDT-SWAP 4h -12.25%
Bybit TIAUSDT 4h -12.14%
Gate this page TIA_USDT 4h +1.10%
Binance TIAUSDT 4h +1.15%
Binance TIAUSDC 4h +2.83%
Bitget TIAUSDT 4h +8.76%
Lighter TIA 8h +10.51%
Aster TIAUSDT 4h +10.95%
Bybit TIAPERP 8h +10.95%
Hyperliquid TIA 1h +10.95%

TIA By venue →

Common questions

What is the Gate TIA funding rate?

The latest collected Gate TIA funding rate is +0.0005% per 4h rate period, or +1.10% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate TIA?

The collected settlement interval is 4h, normally 6 times a day. Settlements fall at 00:00, 04:00, 08:00, 12:00, 16:00 and 20:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Gate TIA?

The collected leverage cap for Gate TIA is 75x, with 20 margin tiers shown. The first margin tier, up to 10K USDT, allows 75x; the second allows 60x.

What is the maintenance margin rate on Gate TIA?

The first tier requires 0.8333%, with 20 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Which venue has the lowest TIA funding cost for longs?

For a long position, OKX currently has the lowest rate at -12.25% annualised; this page's Gate is at +1.10%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

What has Gate TIA funding paid over the past 30 days?

Settlements over the past 30 days annualise to +4.71% across 179 settlements, 21% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-10-15 05:10 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology

History coverage for this contract

179 settlements are available, covering 716 known-period hours, from 2026-09-15 08:00 to 2026-10-15 00:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.