English

Gate TAKE perpetual

TAKE_USDT

Use this contract in the calculator →

As of 2026-10-01 00:31 UTC, TAKE_USDT on Gate has a collected rate of +0.0050% over 4h, or +10.95% simple annualised; its collected settlement interval is 4h, with up to 20x leverage.

Rate
+0.0050%
Rate period: 4h
Annualised
+10.95%
265.7K 24h turnover
Max leverage
20x
17 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For TAKE_USDT, 10,000 USDT of notional × 0.005000% gives 0.5000 USDT over the quoted 4h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for TAKE_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 3.0000% maintenance margin.

Contract units and calculator input

One TAKE_USDT contract represents 10 TAKE. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 2.5000% 20.00x —
2 5000 – 10000 quote 3.0000% 18.00x 25
3 10000 – 20000 quote 4.0000% 15.00x 125
4 20000 – 50000 quote 4.5000% 12.00x 225
5 50000 – 70000 quote 5.0000% 10.00x 475
6 70000 – 100000 quote 6.0000% 8.00x 1175
7 100000 – 150000 quote 8.0000% 7.00x 3175
8 150000 – 200000 quote 10.0000% 6.00x 6175
9 200000 – 300000 quote 15.0000% 5.00x 16175
10 300000 – 500000 quote 20.0000% 4.00x 31175
11 500000 – 1000000 quote 24.0000% 3.50x 51175
12 1000000 – 1500000 quote 28.0000% 3.00x 91175
13 1500000 – 2000000 quote 35.0000% 2.50x 196175
14 2000000 – 2500000 quote 45.0000% 2.00x 396175
15 2500000 – 3000000 quote 60.0000% 1.50x 771175
16 3000000 – 4000000 quote 78.0000% 1.20x 1311175
17 4000000 – ∞ quote 90.0000% 1.05x 1791175

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
TAKE_USDT
Mark price
0.0603
Tick size
0.00001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Gate this page TAKE_USDT 4h +10.95%
Aster TAKEUSDT 4h +112.37%
Binance TAKEUSDT 4h +121.29%

TAKE By venue →

Common questions

What is the Gate TAKE funding rate?

The latest collected Gate TAKE funding rate is +0.0050% per 4h rate period, or +10.95% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate TAKE?

The collected settlement interval is 4h, normally 6 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate TAKE?

The collected leverage cap for Gate TAKE is 20x, with 17 margin tiers shown. The first margin tier, up to 5K USDT, allows 20x; the second allows 18x.

What is the maintenance margin rate on Gate TAKE?

The first tier requires 2.5000%, with 17 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Observation time and verification

This contract’s funding was observed at 2026-10-01 00:31 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology