English

Gate SSV perpetual

SSV_USDT

Use this contract in the calculator →

As of 2026-10-15 04:54 UTC, SSV_USDT on Gate has a collected rate of +0.0100% over 8h, or +10.95% simple annualised; its collected settlement interval is 8h, with up to 25x leverage. Binance has a lower rate for longs at -5.11%.

Rate
+0.0100%
Rate period: 8h
Annualised
+10.95%
26.6K 24h turnover
Max leverage
25x
10 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For SSV_USDT, 10,000 USDT of notional × 0.010000% gives 1.0000 USDT over the quoted 8h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for SSV_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 1000 USDT. Above that, tier 2 requires 2.2500% maintenance margin.

Contract units and calculator input

One SSV_USDT contract represents 0.1 SSV. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 1000 quote 2.0000% 25.00x —
2 1000 – 3000 quote 2.2500% 22.00x 2.5
3 3000 – 5000 quote 2.5000% 20.00x 10
4 5000 – 10000 quote 3.0000% 18.00x 35
5 10000 – 30000 quote 4.0000% 16.00x 135
6 30000 – 50000 quote 20.0000% 3.30x 4935
7 50000 – 70000 quote 25.0000% 2.50x 7435
8 70000 – 100000 quote 40.0000% 2.00x 17935
9 100000 – 200000 quote 75.0000% 1.25x 52935
10 200000 – ∞ quote 95.0000% 1.00x 92935

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h (00:00 · 08:00 · 16:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
SSV_USDT
Mark price
2.5820
Tick size
0.001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Binance SSVUSDT 8h -5.11%
Bitget SSVUSDT 8h -0.66%
Bybit SSVUSDT 8h +10.95%
Gate this page SSV_USDT 8h +10.95%
OKX SSV-USDT-SWAP 8h +10.95%

SSV By venue →

Common questions

What is the Gate SSV funding rate?

The latest collected Gate SSV funding rate is +0.0100% per 8h rate period, or +10.95% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate SSV?

The collected settlement interval is 8h, normally 3 times a day. Settlements fall at 00:00, 08:00 and 16:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Gate SSV?

The collected leverage cap for Gate SSV is 25x, with 10 margin tiers shown. The first margin tier, up to 1K USDT, allows 25x; the second allows 22x.

What is the maintenance margin rate on Gate SSV?

The first tier requires 2.0000%, with 10 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Which venue has the lowest SSV funding cost for longs?

For a long position, Binance currently has the lowest rate at -5.11% annualised; this page's Gate is at +10.95%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

Observation time and verification

This contract’s funding was observed at 2026-10-15 04:54 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology