English

Gate SQD perpetual

SQD_USDT

Use this contract in the calculator →

As of 2026-10-15 04:54 UTC, SQD_USDT on Gate has a collected rate of +0.0050% over 4h, or +10.95% simple annualised; its collected settlement interval is 4h, with up to 20x leverage.

Rate
+0.0050%
Rate period: 4h
Annualised
+10.95%
114.0K 24h turnover
Max leverage
20x
13 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For SQD_USDT, 10,000 USDT of notional × 0.005000% gives 0.5000 USDT over the quoted 4h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for SQD_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 3.0000% maintenance margin.

Contract units and calculator input

One SQD_USDT contract represents 10 SQD. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 2.5000% 20.00x —
2 5000 – 10000 quote 3.0000% 16.00x 25
3 10000 – 20000 quote 3.5000% 14.00x 75
4 20000 – 30000 quote 4.0000% 12.00x 175
5 30000 – 50000 quote 5.0000% 10.00x 475
6 50000 – 70000 quote 6.5000% 8.00x 1225
7 70000 – 100000 quote 8.0000% 6.00x 2275
8 100000 – 200000 quote 10.0000% 5.00x 4275
9 200000 – 300000 quote 15.0000% 4.00x 14275
10 300000 – 500000 quote 20.0000% 3.00x 29275
11 500000 – 1000000 quote 25.0000% 2.00x 54275
12 1000000 – 1500000 quote 40.0000% 1.50x 204275
13 1500000 – ∞ quote 70.0000% 1.05x 654275

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h (00:00 · 04:00 · 08:00 · 12:00 · 16:00 · 20:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
SQD_USDT
Mark price
0.0221
Tick size
0.00001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Aster SQDUSDT 4h +10.95%
Binance SQDUSDT 4h +10.95%
Bitget SQDUSDT 4h +10.95%
Bybit SQDUSDT 4h +10.95%
Gate this page SQD_USDT 4h +10.95%

SQD By venue →

Common questions

What is the Gate SQD funding rate?

The latest collected Gate SQD funding rate is +0.0050% per 4h rate period, or +10.95% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate SQD?

The collected settlement interval is 4h, normally 6 times a day. Settlements fall at 00:00, 04:00, 08:00, 12:00, 16:00 and 20:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Gate SQD?

The collected leverage cap for Gate SQD is 20x, with 13 margin tiers shown. The first margin tier, up to 5K USDT, allows 20x; the second allows 16x.

What is the maintenance margin rate on Gate SQD?

The first tier requires 2.5000%, with 13 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Observation time and verification

This contract’s funding was observed at 2026-10-15 04:54 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology