English

OKX SPCX perpetual

SPCX-USDT-SWAP

Use this contract in the calculator →

As of 2026-10-01 00:00 UTC, SPCX-USDT-SWAP on OKX has a collected rate of +0.0048% over 8h, or +5.31% simple annualised; its collected settlement interval is 8h, with up to 75x leverage. Gate has a lower rate for longs at 0.00%.

Rate
+0.0048%
Rate period: 8h
Annualised
+5.31%
136.1M 24h turnover
Max leverage
75x
98 Tier
30d realised APR
-0.44%
24 settlements

Settled rates over the past 30 days

Annualised · -0.44% · range -10.6% … 0.0% · 24 settlements

Settled funding for SPCX-USDT-SWAP

The latest 30-day window contains 24 settlements covering 192 known-period hours, with a cumulative rate of -0.0097%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-09-09 00:000.0000%8h
2026-09-08 16:000.0000%8h
2026-09-08 08:000.0000%8h
2026-09-08 00:000.0000%8h
2026-09-07 16:000.0000%8h
2026-09-07 08:000.0000%8h
2026-09-07 00:000.0000%8h
2026-09-06 16:000.0000%8h
2026-09-06 08:000.0000%8h
2026-09-06 00:000.0000%8h
2026-09-05 16:000.0000%8h
2026-09-05 08:000.0000%8h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For SPCX-USDT-SWAP, 10,000 USDT of notional × 0.004849% gives 0.4849 USDT over the quoted 8h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for SPCX-USDT-SWAP?

This table selects tiers by base-asset quantity in SPCX, not by the amount of margin deposited. The first tier starts at 0 and ends at 1000 SPCX. Above that, tier 2 requires 1.0000% maintenance margin.

Contract units and calculator input

One SPCX-USDT-SWAP contract represents 1 SPCX. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Maintenance margin ladder

No deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 1000 base 0.6500% 75.00x —
2 1000.01 – 2000 base 1.0000% 50.00x —
3 2000.01 – 4000 base 1.5000% 40.00x —
4 4000.01 – 8000 base 2.0000% 33.33x —
5 8000.01 – 12000 base 2.5000% 28.57x —
6 12000.01 – 16000 base 3.0000% 25.00x —
7 16000.01 – 20000 base 3.5000% 22.22x —
8 20000.01 – 24000 base 4.0000% 20.00x —
9 24000.01 – 28000 base 4.5000% 18.18x —
10 28000.01 – 32000 base 5.0000% 16.67x —
11 32000.01 – 36000 base 5.5000% 15.38x —
12 36000.01 – 40000 base 6.0000% 14.29x —
13 40000.01 – 44000 base 6.5000% 13.33x —
14 44000.01 – 48000 base 7.0000% 12.50x —
15 48000.01 – 52000 base 7.5000% 11.76x —
16 52000.01 – 56000 base 8.0000% 11.11x —
17 56000.01 – 60000 base 8.5000% 10.53x —
18 60000.01 – 64000 base 9.0000% 10.00x —
19 64000.01 – 68000 base 9.5000% 9.52x —
20 68000.01 – 72000 base 10.0000% 9.09x —
21 72000.01 – 76000 base 10.5000% 8.70x —
22 76000.01 – 80000 base 11.0000% 8.33x —
23 80000.01 – 84000 base 11.5000% 8.00x —
24 84000.01 – 88000 base 12.0000% 7.69x —
25 88000.01 – 92000 base 12.5000% 7.41x —
26 92000.01 – 96000 base 13.0000% 7.14x —
27 96000.01 – 100000 base 13.5000% 6.90x —
28 100000.01 – 104000 base 14.0000% 6.67x —
29 104000.01 – 108000 base 14.5000% 6.45x —
30 108000.01 – 112000 base 15.0000% 6.25x —
31 112000.01 – 116000 base 15.5000% 6.06x —
32 116000.01 – 120000 base 16.0000% 5.88x —
33 120000.01 – 124000 base 16.5000% 5.71x —
34 124000.01 – 128000 base 17.0000% 5.56x —
35 128000.01 – 132000 base 17.5000% 5.41x —
36 132000.01 – 136000 base 18.0000% 5.26x —
37 136000.01 – 140000 base 18.5000% 5.13x —
38 140000.01 – 144000 base 19.0000% 5.00x —
39 144000.01 – 148000 base 19.5000% 4.88x —
40 148000.01 – 152000 base 20.0000% 4.76x —
41 152000.01 – 156000 base 20.5000% 4.65x —
42 156000.01 – 160000 base 21.0000% 4.55x —
43 160000.01 – 164000 base 21.5000% 4.44x —
44 164000.01 – 168000 base 22.0000% 4.35x —
45 168000.01 – 172000 base 22.5000% 4.26x —
46 172000.01 – 176000 base 23.0000% 4.17x —
47 176000.01 – 180000 base 23.5000% 4.08x —
48 180000.01 – 184000 base 24.0000% 4.00x —
49 184000.01 – 188000 base 24.5000% 3.92x —
50 188000.01 – 192000 base 25.0000% 3.85x —
51 192000.01 – 196000 base 25.5000% 3.77x —
52 196000.01 – 200000 base 26.0000% 3.70x —
53 200000.01 – 204000 base 26.5000% 3.64x —
54 204000.01 – 208000 base 27.0000% 3.57x —
55 208000.01 – 212000 base 27.5000% 3.51x —
56 212000.01 – 216000 base 28.0000% 3.45x —
57 216000.01 – 220000 base 28.5000% 3.39x —
58 220000.01 – 224000 base 29.0000% 3.33x —
59 224000.01 – 228000 base 29.5000% 3.28x —
60 228000.01 – 232000 base 30.0000% 3.23x —
61 232000.01 – 236000 base 30.5000% 3.17x —
62 236000.01 – 240000 base 31.0000% 3.13x —
63 240000.01 – 244000 base 31.5000% 3.08x —
64 244000.01 – 248000 base 32.0000% 3.03x —
65 248000.01 – 252000 base 32.5000% 2.99x —
66 252000.01 – 256000 base 33.0000% 2.94x —
67 256000.01 – 260000 base 33.5000% 2.90x —
68 260000.01 – 264000 base 34.0000% 2.86x —
69 264000.01 – 268000 base 34.5000% 2.82x —
70 268000.01 – 272000 base 35.0000% 2.78x —
71 272000.01 – 276000 base 35.5000% 2.74x —
72 276000.01 – 280000 base 36.0000% 2.70x —
73 280000.01 – 284000 base 36.5000% 2.67x —
74 284000.01 – 288000 base 37.0000% 2.63x —
75 288000.01 – 292000 base 37.5000% 2.60x —
76 292000.01 – 296000 base 38.0000% 2.56x —
77 296000.01 – 300000 base 38.5000% 2.53x —
78 300000.01 – 304000 base 39.0000% 2.50x —
79 304000.01 – 308000 base 39.5000% 2.47x —
80 308000.01 – 312000 base 40.0000% 2.44x —
81 312000.01 – 316000 base 40.5000% 2.41x —
82 316000.01 – 320000 base 41.0000% 2.38x —
83 320000.01 – 324000 base 41.5000% 2.35x —
84 324000.01 – 328000 base 42.0000% 2.33x —
85 328000.01 – 332000 base 42.5000% 2.30x —
86 332000.01 – 336000 base 43.0000% 2.27x —
87 336000.01 – 340000 base 43.5000% 2.25x —
88 340000.01 – 344000 base 44.0000% 2.22x —
89 344000.01 – 348000 base 44.5000% 2.20x —
90 348000.01 – 352000 base 45.0000% 2.17x —
91 352000.01 – 356000 base 45.5000% 2.15x —
92 356000.01 – 360000 base 46.0000% 2.13x —
93 360000.01 – 364000 base 46.5000% 2.11x —
94 364000.01 – 368000 base 47.0000% 2.08x —
95 368000.01 – 372000 base 47.5000% 2.06x —
96 372000.01 – 376000 base 48.0000% 2.04x —
97 376000.01 – 380000 base 48.5000% 2.02x —
98 380000.01 – 384000 base 49.0000% 2.00x —

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
SPCX-USDT-SWAP
Mark price
151.1700
Tick size
0.01
Lot size
0.01

The same asset elsewhere

Venue Contract Rate period Annualised
Gate SPCX_USDT 8h 0.00%
Lighter SPCX 8h +3.50%
OKX this page SPCX-USDT-SWAP 8h +5.31%
Bybit SPCXUSDT 8h +5.50%
Aster SPCXUSDT 8h +21.50%
Bitget SPCXUSDT 8h +21.68%
Aster SPCXUSD1 8h +33.21%

SPCX By venue →

Common questions

What is the OKX SPCX funding rate?

The latest collected OKX SPCX funding rate is +0.0048% per 8h rate period, or +5.31% simple annualised. At this rate longs pay shorts.

How often is funding charged on OKX SPCX?

The collected settlement interval is 8h, normally 3 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on OKX SPCX?

The collected leverage cap for OKX SPCX is 75x, with 98 margin tiers shown. The first margin tier, up to 1000 SPCX, allows 75x; the second allows 50x.

What is the maintenance margin rate on OKX SPCX?

The first tier requires 0.6500%, with 98 available tiers. The applicable requirement depends on the position’s tier. This venue applies no deduction: maintenance margin = notional × the rate of the tier the position falls in.

Which venue has the lowest SPCX funding cost for longs?

For a long position, Gate currently has the lowest rate at 0.00% annualised; this page's OKX is at +5.31%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

What has OKX SPCX funding paid over the past 30 days?

Settlements over the past 30 days annualise to -0.44% across 24 settlements, 4% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-10-01 00:00 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. OKX official data source · Funding methodology

History coverage for this contract

24 settlements are available, covering 192 known-period hours, from 2026-09-01 08:00 to 2026-09-09 00:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.