English

Gate SAMSUNG perpetual

SAMSUNG_USDT

Use this contract in the calculator →

As of 2026-09-30 23:59 UTC, SAMSUNG_USDT on Gate has a collected rate of 0.0000% over 4h, or 0.00% simple annualised; its collected settlement interval is 4h, with up to 75x leverage.

Rate
0.0000%
Rate period: 4h
Annualised
0.00%
19.7M 24h turnover
Max leverage
75x
18 Tier
30d realised APR
+0.28%
50 settlements

Settled rates over the past 30 days

Annualised · +0.28% · range -13.1% … +37.2% · 50 settlements

Settled funding for SAMSUNG_USDT

The latest 30-day window contains 50 settlements covering 200 known-period hours, with a cumulative rate of +0.0063%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-09-09 04:000.0000%4h
2026-09-09 00:000.0000%4h
2026-09-08 20:000.0000%4h
2026-09-08 16:000.0000%4h
2026-09-08 12:000.0000%4h
2026-09-08 08:000.0000%4h
2026-09-08 04:000.0000%4h
2026-09-08 00:000.0000%4h
2026-09-07 20:000.0000%4h
2026-09-07 16:000.0000%4h
2026-09-07 12:000.0000%4h
2026-09-07 08:000.0000%4h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For SAMSUNG_USDT, 10,000 USDT of notional × 0.000000% gives 0.0000 USDT over the quoted 4h rate period: neither side pays funding at this rate. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for SAMSUNG_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 1.0000% maintenance margin.

Contract units and calculator input

One SAMSUNG_USDT contract represents 0.01 SAMSUNG. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 0.8333% 75.00x —
2 5000 – 10000 quote 1.0000% 50.00x 8.335
3 10000 – 20000 quote 1.5000% 40.00x 58.335
4 20000 – 50000 quote 2.0000% 30.00x 158.335
5 50000 – 70000 quote 2.5000% 25.00x 408.335
6 70000 – 100000 quote 3.0000% 20.00x 758.335
7 100000 – 200000 quote 4.0000% 16.00x 1758.335
8 200000 – 300000 quote 5.0000% 14.00x 3758.335
9 300000 – 500000 quote 6.0000% 12.00x 6758.335
10 500000 – 700000 quote 8.0000% 10.00x 16758.335
11 700000 – 1000000 quote 10.0000% 8.00x 30758.335
12 1000000 – 1500000 quote 12.0000% 6.00x 50758.335
13 1500000 – 2000000 quote 15.0000% 5.00x 95758.335
14 2000000 – 2500000 quote 20.0000% 4.00x 195758.335
15 2500000 – 3000000 quote 30.0000% 3.00x 445758.335
16 3000000 – 4000000 quote 45.0000% 2.00x 895758.335
17 4000000 – 5000000 quote 60.0000% 1.50x 1495758.335
18 5000000 – ∞ quote 90.0000% 1.05x 2995758.335

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
SAMSUNG_USDT
Mark price
196.5800
Tick size
0.01
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Bybit SAMSUNGUSDT 8h 0.00%
Gate this page SAMSUNG_USDT 4h 0.00%
OKX SAMSUNG-USDT-SWAP 8h 0.00%
Bitget SAMSUNGUSDT 4h +13.80%
Aster SAMSUNGUSDT 4h +33.32%

SAMSUNG By venue →

Common questions

What is the Gate SAMSUNG funding rate?

The latest collected Gate SAMSUNG funding rate is 0.0000% per 4h rate period, or 0.00% simple annualised.

How often is funding charged on Gate SAMSUNG?

The collected settlement interval is 4h, normally 6 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate SAMSUNG?

The collected leverage cap for Gate SAMSUNG is 75x, with 18 margin tiers shown. The first margin tier, up to 5K USDT, allows 75x; the second allows 50x.

What is the maintenance margin rate on Gate SAMSUNG?

The first tier requires 0.8333%, with 18 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

What has Gate SAMSUNG funding paid over the past 30 days?

Settlements over the past 30 days annualise to +0.28% across 50 settlements, 6% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-09-30 23:59 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology

History coverage for this contract

50 settlements are available, covering 200 known-period hours, from 2026-09-01 00:00 to 2026-09-09 04:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.