English

Gate QQQ perpetual

QQQ_USDT

Use this contract in the calculator →

As of 2026-09-30 23:44 UTC, QQQ_USDT on Gate has a collected rate of 0.0000% over 8h, or 0.00% simple annualised; its collected settlement interval is 8h, with up to 50x leverage.

Rate
0.0000%
Rate period: 8h
Annualised
0.00%
24.9M 24h turnover
Max leverage
50x
15 Tier
30d realised APR
+2.75%
20 settlements

Settled rates over the past 30 days

Annualised · +2.75% · range 0.0% … +27.8% · 20 settlements

Settled funding for QQQ_USDT

The latest 30-day window contains 20 settlements covering 160 known-period hours, with a cumulative rate of +0.0502%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-09-09 00:000.0000%8h
2026-09-08 16:000.0000%8h
2026-09-08 08:000.0000%8h
2026-09-08 00:000.0000%8h
2026-09-07 16:000.0000%8h
2026-09-07 08:00+0.0148%8h
2026-09-07 00:00+0.0254%8h
2026-09-06 16:00+0.0089%8h
2026-09-06 08:00+0.0011%8h
2026-09-06 00:000.0000%8h
2026-09-05 16:000.0000%8h
2026-09-05 08:000.0000%8h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For QQQ_USDT, 10,000 USDT of notional × 0.000000% gives 0.0000 USDT over the quoted 8h rate period: neither side pays funding at this rate. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for QQQ_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 200000 USDT. Above that, tier 2 requires 1.5000% maintenance margin.

Contract units and calculator input

One QQQ_USDT contract represents 0.01 QQQ. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 200000 quote 1.0000% 50.00x —
2 200000 – 300000 quote 1.5000% 40.00x 1000
3 300000 – 400000 quote 2.3000% 30.00x 3400
4 400000 – 500000 quote 3.0000% 25.00x 6200
5 500000 – 700000 quote 4.0000% 20.00x 11200
6 700000 – 1000000 quote 5.0000% 16.00x 18200
7 1000000 – 1500000 quote 6.5000% 12.00x 33200
8 1500000 – 2000000 quote 8.0000% 10.00x 55700
9 2000000 – 3000000 quote 10.0000% 8.00x 95700
10 3000000 – 4000000 quote 12.0000% 6.60x 155700
11 4000000 – 5000000 quote 15.0000% 5.00x 275700
12 5000000 – 6000000 quote 28.0000% 3.00x 925700
13 6000000 – 7000000 quote 45.0000% 2.00x 1945700
14 7000000 – 8000000 quote 60.0000% 1.50x 2995700
15 8000000 – ∞ quote 85.0000% 1.05x 4995700

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
QQQ_USDT
Mark price
743.8500
Tick size
0.01
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Bitget QQQUSDT 8h 0.00%
Bybit QQQUSDT 8h 0.00%
Gate this page QQQ_USDT 8h 0.00%
OKX QQQ-USDT-SWAP 8h 0.00%
Aster QQQUSDT 8h +3.15%
Lighter QQQ 8h +3.50%

QQQ By venue →

Common questions

What is the Gate QQQ funding rate?

The latest collected Gate QQQ funding rate is 0.0000% per 8h rate period, or 0.00% simple annualised.

How often is funding charged on Gate QQQ?

The collected settlement interval is 8h, normally 3 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate QQQ?

The collected leverage cap for Gate QQQ is 50x, with 15 margin tiers shown. The first margin tier, up to 200K USDT, allows 50x; the second allows 40x.

What is the maintenance margin rate on Gate QQQ?

The first tier requires 1.0000%, with 15 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

What has Gate QQQ funding paid over the past 30 days?

Settlements over the past 30 days annualise to +2.75% across 20 settlements, 0% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-09-30 23:44 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology

History coverage for this contract

20 settlements are available, covering 160 known-period hours, from 2026-09-02 16:00 to 2026-09-09 00:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.