English

Gate PTB perpetual

PTB_USDT

Use this contract in the calculator →

As of 2026-11-04 08:47 UTC, PTB_USDT on Gate has a collected rate of +0.0050% over 4h, or +10.95% simple annualised; its collected settlement interval is 4h, with up to 10x leverage. Bybit has a lower rate for longs at 0.00%.

Rate
+0.0050%
Rate period: 4h
Annualised
+10.95%
97.9K 24h turnover
Max leverage
10x
13 Tier
30d realised APR
-47.18%
133 settlements

Settled rates over the past 30 days

Annualised · -47.18% · range -4380.0% … +346.7% · 133 settlements

Settled funding for PTB_USDT

The latest 30-day window contains 133 settlements covering 464 known-period hours, with a cumulative rate of -2.4988%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-10-24 16:00+0.0252%4h
2026-10-24 12:00+0.0050%4h
2026-10-24 08:00+0.0600%4h
2026-10-24 04:00+0.0050%4h
2026-10-24 00:00+0.0050%4h
2026-10-23 20:00+0.0025%2h
2026-10-23 18:00+0.0012%1h
2026-10-23 17:00+0.0012%1h
2026-10-23 16:00+0.0012%1h
2026-10-23 15:00+0.0012%1h
2026-10-23 14:00+0.0012%1h
2026-10-23 13:00+0.0012%1h

Interval changes: 1h → 4h from 2026-10-24 00:00 UTC; 4h → 1h from 2026-10-22 21:00 UTC. The period column above is the hours each settlement covered.

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For PTB_USDT, 10,000 USDT of notional × 0.005000% gives 0.5000 USDT over the quoted 4h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for PTB_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 10000 USDT. Above that, tier 2 requires 6.0000% maintenance margin.

Contract units and calculator input

One PTB_USDT contract represents 100 PTB. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 10000 quote 5.0000% 10.00x —
2 10000 – 20000 quote 6.0000% 9.00x 100
3 20000 – 30000 quote 7.0000% 8.00x 300
4 30000 – 50000 quote 8.0000% 7.00x 600
5 50000 – 70000 quote 10.0000% 6.00x 1600
6 70000 – 100000 quote 15.0000% 5.00x 5100
7 100000 – 200000 quote 20.0000% 4.00x 10100
8 200000 – 300000 quote 25.0000% 3.00x 20100
9 300000 – 500000 quote 35.0000% 2.00x 50100
10 500000 – 700000 quote 45.0000% 1.80x 100100
11 700000 – 1000000 quote 55.0000% 1.50x 170100
12 1000000 – 1500000 quote 65.0000% 1.20x 270100
13 1500000 – ∞ quote 85.0000% 1.05x 570100

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h (00:00 · 04:00 · 08:00 · 12:00 · 16:00 · 20:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
PTB_USDT
Mark price
0.0001
Tick size
0.0000001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Bybit PTBUSDT 4h 0.00%
Gate this page PTB_USDT 4h +10.95%

PTB By venue →

Common questions

What is the Gate PTB funding rate?

The latest collected Gate PTB funding rate is +0.0050% per 4h rate period, or +10.95% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate PTB?

The collected settlement interval is 4h, normally 6 times a day. Settlements fall at 00:00, 04:00, 08:00, 12:00, 16:00 and 20:00 UTC, the same times in UTC+8. Its interval changed in the past 30 days: 1h to 4h on 2026-10-24 00:00 UTC and 4h to 1h on 2026-10-22 21:00 UTC. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Gate PTB?

The collected leverage cap for Gate PTB is 10x, with 13 margin tiers shown. The first margin tier, up to 10K USDT, allows 10x; the second allows 9x.

What is the maintenance margin rate on Gate PTB?

The first tier requires 5.0000%, with 13 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Which venue has the lowest PTB funding cost for longs?

For a long position, Bybit currently has the lowest rate at 0.00% annualised; this page's Gate is at +10.95%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

What has Gate PTB funding paid over the past 30 days?

Settlements over the past 30 days annualise to -47.18% across 133 settlements, 9% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-11-04 08:47 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology

History coverage for this contract

133 settlements are available, covering 464 known-period hours, from 2026-10-05 12:00 to 2026-10-24 16:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.