English

Gate NVDA perpetual

NVDA_USDT

Use this contract in the calculator →

As of 2026-09-30 23:44 UTC, NVDA_USDT on Gate has a collected rate of 0.0000% over 8h, or 0.00% simple annualised; its collected settlement interval is 8h, with up to 100x leverage.

Rate
0.0000%
Rate period: 8h
Annualised
0.00%
15.5M 24h turnover
Max leverage
100x
12 Tier
30d realised APR
+1.16%
20 settlements

Settled rates over the past 30 days

Annualised · +1.16% · range -22.2% … +39.4% · 20 settlements

Settled funding for NVDA_USDT

The latest 30-day window contains 20 settlements covering 160 known-period hours, with a cumulative rate of +0.0211%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-09-09 00:00+0.0003%8h
2026-09-08 16:000.0000%8h
2026-09-08 08:00+0.0360%8h
2026-09-08 00:00+0.0079%8h
2026-09-07 16:00+0.0033%8h
2026-09-07 08:000.0000%8h
2026-09-07 00:000.0000%8h
2026-09-06 16:000.0000%8h
2026-09-06 08:000.0000%8h
2026-09-06 00:000.0000%8h
2026-09-05 16:000.0000%8h
2026-09-05 08:00-0.0152%8h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For NVDA_USDT, 10,000 USDT of notional × 0.000000% gives 0.0000 USDT over the quoted 8h rate period: neither side pays funding at this rate. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for NVDA_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 0.7500% maintenance margin.

Contract units and calculator input

One NVDA_USDT contract represents 0.01 NVDA. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 0.5000% 100.00x —
2 5000 – 10000 quote 0.7500% 75.00x 12.5
3 10000 – 20000 quote 1.0000% 50.00x 37.5
4 20000 – 50000 quote 1.5000% 40.00x 137.5
5 50000 – 100000 quote 2.0000% 25.00x 387.5
6 100000 – 200000 quote 3.0000% 20.00x 1387.5
7 200000 – 500000 quote 5.0000% 10.00x 5387.5
8 500000 – 1000000 quote 10.0000% 5.00x 30387.5
9 1000000 – 1500000 quote 20.0000% 3.00x 130387.5
10 1500000 – 2500000 quote 30.0000% 2.00x 280387.5
11 2500000 – 4000000 quote 40.0000% 1.50x 530387.5
12 4000000 – ∞ quote 60.0000% 1.05x 1330387.5

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
NVDA_USDT
Mark price
230.0000
Tick size
0.01
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Gate this page NVDA_USDT 8h 0.00%
Lighter NVDA 8h +3.50%
Bybit NVDAUSDT 8h +15.47%
OKX NVDA-USDT-SWAP 8h +15.62%
Aster NVDAUSDT 8h +15.75%
Bitget NVDAUSDT 8h +26.61%

NVDA By venue →

Common questions

What is the Gate NVDA funding rate?

The latest collected Gate NVDA funding rate is 0.0000% per 8h rate period, or 0.00% simple annualised.

How often is funding charged on Gate NVDA?

The collected settlement interval is 8h, normally 3 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate NVDA?

The collected leverage cap for Gate NVDA is 100x, with 12 margin tiers shown. The first margin tier, up to 5K USDT, allows 100x; the second allows 75x.

What is the maintenance margin rate on Gate NVDA?

The first tier requires 0.5000%, with 12 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

What has Gate NVDA funding paid over the past 30 days?

Settlements over the past 30 days annualise to +1.16% across 20 settlements, 10% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-09-30 23:44 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology

History coverage for this contract

20 settlements are available, covering 160 known-period hours, from 2026-09-02 16:00 to 2026-09-09 00:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.