English

Aster MUBARAK perpetual

MUBARAKUSDT

Use this contract in the calculator →

As of 2026-10-01 00:31 UTC, MUBARAKUSDT on Aster has a collected rate of +0.0050% over 4h, or +10.95% simple annualised; its collected settlement interval is 4h, with up to 5x leverage.

Rate
+0.0050%
Rate period: 4h
Annualised
+10.95%
35.8K 24h turnover
Max leverage
5x
5 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For MUBARAKUSDT, 10,000 USDT of notional × 0.005000% gives 0.5000 USDT over the quoted 4h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for MUBARAKUSDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 500000 USDT. Above that, tier 2 requires 12.5000% maintenance margin.

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 500000 quote 10.0000% 5.00x —
2 500000 – 1000000 quote 12.5000% 4.00x 12500
3 1000000 – 2500000 quote 16.6700% 3.00x 54200
4 2500000 – 5000000 quote 25.0000% 2.00x 262450
5 5000000 – 1000000000 quote 50.0000% 1.00x 1512450

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
MUBARAKUSDT
Mark price
0.0597
Tick size
0.00001
Lot size
1
Min notional
5

The same asset elsewhere

Venue Contract Rate period Annualised
Aster this page MUBARAKUSDT 4h +10.95%
Binance MUBARAKUSDT 4h +10.95%
Bitget MUBARAKUSDT 4h +10.95%
Gate MUBARAK_USDT 4h +10.95%
OKX MUBARAK-USDT-SWAP 4h +11.98%
Bybit MUBARAKUSDT 4h +63.48%

MUBARAK By venue →

Common questions

What is the Aster MUBARAK funding rate?

The latest collected Aster MUBARAK funding rate is +0.0050% per 4h rate period, or +10.95% simple annualised. At this rate longs pay shorts.

How often is funding charged on Aster MUBARAK?

The collected settlement interval is 4h, normally 6 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Aster MUBARAK?

The collected leverage cap for Aster MUBARAK is 5x, with 5 margin tiers shown. The first margin tier, up to 500K USDT, allows 5x; the second allows 4x.

What is the maintenance margin rate on Aster MUBARAK?

The first tier requires 10.0000%, with 5 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Observation time and verification

This contract’s funding was observed at 2026-10-01 00:31 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Aster official data source · Funding methodology