English

Gate MOVR perpetual

MOVR_USDT

Use this contract in the calculator →

As of 2026-09-30 23:59 UTC, MOVR_USDT on Gate has a collected rate of -0.0105% over 8h, or -11.50% simple annualised; its collected settlement interval is 8h, with up to 25x leverage.

Rate
-0.0105%
Rate period: 8h
Annualised
-11.50%
30.7M 24h turnover
Max leverage
25x
16 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For MOVR_USDT, 10,000 USDT of notional × -0.010500% gives 1.0500 USDT over the quoted 8h rate period: longs receive and shorts pay. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for MOVR_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 2.5000% maintenance margin.

Contract units and calculator input

One MOVR_USDT contract represents 0.01 MOVR. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 2.0000% 25.00x —
2 5000 – 10000 quote 2.5000% 20.00x 25
3 10000 – 20000 quote 3.0000% 18.00x 75
4 20000 – 50000 quote 4.0000% 15.00x 275
5 50000 – 100000 quote 4.5000% 12.00x 525
6 100000 – 150000 quote 5.0000% 10.00x 1025
7 150000 – 200000 quote 6.0000% 8.00x 2525
8 200000 – 500000 quote 8.0000% 6.60x 6525
9 500000 – 700000 quote 10.0000% 5.00x 16525
10 700000 – 1000000 quote 15.0000% 4.00x 51525
11 1000000 – 1500000 quote 25.0000% 3.00x 151525
12 1500000 – 2000000 quote 35.0000% 2.00x 301525
13 2000000 – 3000000 quote 50.0000% 1.50x 601525
14 3000000 – 4000000 quote 60.0000% 1.33x 901525
15 4000000 – 5000000 quote 70.0000% 1.20x 1301525
16 5000000 – ∞ quote 80.0000% 1.05x 1801525

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
MOVR_USDT
Mark price
2.1880
Tick size
0.001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Gate this page MOVR_USDT 8h -11.50%
Aster MOVRUSDT 4h +10.95%
Binance MOVRUSDT 4h +10.95%
Bitget MOVRUSDT 4h +10.95%
Bybit MOVRUSDT 4h +10.95%

MOVR By venue →

Common questions

What is the Gate MOVR funding rate?

The latest collected Gate MOVR funding rate is -0.0105% per 8h rate period, or -11.50% simple annualised. At this rate shorts pay longs.

How often is funding charged on Gate MOVR?

The collected settlement interval is 8h, normally 3 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate MOVR?

The collected leverage cap for Gate MOVR is 25x, with 16 margin tiers shown. The first margin tier, up to 5K USDT, allows 25x; the second allows 20x.

What is the maintenance margin rate on Gate MOVR?

The first tier requires 2.0000%, with 16 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Observation time and verification

This contract’s funding was observed at 2026-09-30 23:59 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology