English

Gate MNT perpetual

MNT_USDT

Use this contract in the calculator →

As of 2026-10-15 04:54 UTC, MNT_USDT on Gate has a collected rate of -0.0495% over 4h, or -108.41% simple annualised; its collected settlement interval is 4h, with up to 25x leverage.

Rate
-0.0495%
Rate period: 4h
Annualised
-108.41%
128.5K 24h turnover
Max leverage
25x
17 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For MNT_USDT, 10,000 USDT of notional × -0.049500% gives 4.9500 USDT over the quoted 4h rate period: longs receive and shorts pay. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for MNT_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 3.0000% maintenance margin.

Contract units and calculator input

One MNT_USDT contract represents 1 MNT. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 2.0000% 25.00x —
2 5000 – 7000 quote 3.0000% 22.00x 50
3 7000 – 10000 quote 3.5000% 20.00x 85
4 10000 – 15000 quote 4.0000% 18.00x 135
5 15000 – 20000 quote 5.0000% 15.00x 285
6 20000 – 30000 quote 5.5000% 14.00x 385
7 30000 – 50000 quote 6.0000% 12.00x 535
8 50000 – 70000 quote 6.5000% 11.00x 785
9 70000 – 100000 quote 7.0000% 10.00x 1135
10 100000 – 150000 quote 10.0000% 8.00x 4135
11 150000 – 200000 quote 15.0000% 5.00x 11635
12 200000 – 300000 quote 20.0000% 4.00x 21635
13 300000 – 500000 quote 28.0000% 3.00x 45635
14 500000 – 700000 quote 45.0000% 2.00x 130635
15 700000 – 1000000 quote 60.0000% 1.50x 235635
16 1000000 – 1500000 quote 78.0000% 1.20x 415635
17 1500000 – ∞ quote 90.0000% 1.05x 595635

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h (00:00 · 04:00 · 08:00 · 12:00 · 16:00 · 20:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
MNT_USDT
Mark price
0.5190
Tick size
0.0001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Gate this page MNT_USDT 4h -108.41%
Bybit MNTUSDT 8h +4.64%
Lighter MNT 8h +10.51%
Bybit MNTPERP 8h +10.95%
Hyperliquid MNT 1h +10.95%

MNT By venue →

Common questions

What is the Gate MNT funding rate?

The latest collected Gate MNT funding rate is -0.0495% per 4h rate period, or -108.41% simple annualised. At this rate shorts pay longs.

How often is funding charged on Gate MNT?

The collected settlement interval is 4h, normally 6 times a day. Settlements fall at 00:00, 04:00, 08:00, 12:00, 16:00 and 20:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Gate MNT?

The collected leverage cap for Gate MNT is 25x, with 17 margin tiers shown. The first margin tier, up to 5K USDT, allows 25x; the second allows 22x.

What is the maintenance margin rate on Gate MNT?

The first tier requires 2.0000%, with 17 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Observation time and verification

This contract’s funding was observed at 2026-10-15 04:54 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology