English

Gate MEW perpetual

MEW_USDT

Use this contract in the calculator →

As of 2026-09-30 23:59 UTC, MEW_USDT on Gate has a collected rate of -0.0785% over 4h, or -171.92% simple annualised; its collected settlement interval is 4h, with up to 50x leverage.

Rate
-0.0785%
Rate period: 4h
Annualised
-171.92%
1.4M 24h turnover
Max leverage
50x
9 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For MEW_USDT, 10,000 USDT of notional × -0.078500% gives 7.8500 USDT over the quoted 4h rate period: longs receive and shorts pay. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for MEW_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 10000 USDT. Above that, tier 2 requires 1.5000% maintenance margin.

Contract units and calculator input

One MEW_USDT contract represents 1000 MEW. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 10000 quote 1.0000% 50.00x —
2 10000 – 20000 quote 1.5000% 33.33x 50
3 20000 – 30000 quote 2.0000% 25.00x 150
4 30000 – 50000 quote 3.0000% 16.66x 450
5 50000 – 100000 quote 6.0000% 8.33x 1950
6 100000 – 150000 quote 10.0000% 5.00x 5950
7 150000 – 300000 quote 15.0000% 3.33x 13450
8 300000 – 500000 quote 30.0000% 2.00x 58450
9 500000 – ∞ quote 90.0000% 1.05x 358450

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
MEW_USDT
Mark price
0.0005
Tick size
0.0000001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Gate this page MEW_USDT 4h -171.92%
Binance MEWUSDT 4h -119.54%
OKX MEW-USDT-SWAP 4h -103.52%
Bitget MEWUSDT 4h -72.05%
Bybit MEWUSDT 4h -51.54%

MEW By venue →

Common questions

What is the Gate MEW funding rate?

The latest collected Gate MEW funding rate is -0.0785% per 4h rate period, or -171.92% simple annualised. At this rate shorts pay longs.

How often is funding charged on Gate MEW?

The collected settlement interval is 4h, normally 6 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate MEW?

The collected leverage cap for Gate MEW is 50x, with 9 margin tiers shown. The first margin tier, up to 10K USDT, allows 50x; the second allows 33x.

What is the maintenance margin rate on Gate MEW?

The first tier requires 1.0000%, with 9 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Observation time and verification

This contract’s funding was observed at 2026-09-30 23:59 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology