English

Aster MET perpetual

METUSDT

Use this contract in the calculator →

As of 2026-09-09 14:57 UTC, METUSDT on Aster has a collected rate of +0.0050% over 4h, or +10.95% simple annualised; its collected settlement interval is 4h. Lighter has a lower rate for longs at +10.51%.

Rate
+0.0050%
Rate period: 4h
Annualised
+10.95%
2.9K 24h turnover

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
METUSDT
Mark price
0.2040
Tick size
0.0001
Lot size
1
Min notional
5

The same asset elsewhere

Venue Contract Rate period Annualised
Lighter MET 8h +10.51%
Aster this page METUSDT 4h +10.95%
Binance METUSDT 4h +10.95%
Bitget METUSDT 4h +10.95%
Bybit METUSDT 4h +10.95%
Gate MET_USDT 4h +10.95%
Hyperliquid MET 1h +10.95%
OKX MET-USDT-SWAP 4h +10.95%

MET By venue →

Common questions

What is the Aster MET funding rate?

The latest collected Aster MET funding rate is +0.0050% over a 4h rate period, or +10.95% simple annualised. That period is used for conversion and may differ from the settlement interval. Positive means longs pay shorts; negative reverses this.

How often is funding charged on Aster MET?

The collected settlement interval is 4h, normally 6 times a day. Venues can change it; confirm the next settlement time on the contract page.

Which venue has the lowest MET funding cost for longs?

For a long position, Lighter currently has the lowest rate at +10.51% annualised; this page's Aster is at +10.95%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

Observation time and verification

This contract’s funding was observed at 2026-09-09 14:57 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Aster official data source · Funding methodology