English

As of 2026-10-15 04:54 UTC, M_USDT on Gate has a collected rate of +0.0100% over 8h, or +10.95% simple annualised; its collected settlement interval is 8h, with up to 10x leverage.

Rate
+0.0100%
Rate period: 8h
Annualised
+10.95%
541.6K 24h turnover
Max leverage
10x
13 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For M_USDT, 10,000 USDT of notional × 0.010000% gives 1.0000 USDT over the quoted 8h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for M_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 10000 USDT. Above that, tier 2 requires 9.0000% maintenance margin.

Contract units and calculator input

One M_USDT contract represents 10 M. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 10000 quote 8.0000% 10.00x —
2 10000 – 20000 quote 9.0000% 9.00x 100
3 20000 – 30000 quote 10.0000% 8.00x 300
4 30000 – 50000 quote 12.0000% 7.00x 900
5 50000 – 70000 quote 14.0000% 6.00x 1900
6 70000 – 100000 quote 17.0000% 5.00x 4000
7 100000 – 200000 quote 22.0000% 4.00x 9000
8 200000 – 300000 quote 30.0000% 3.00x 25000
9 300000 – 500000 quote 45.0000% 2.00x 70000
10 500000 – 700000 quote 50.0000% 1.80x 95000
11 700000 – 1000000 quote 60.0000% 1.50x 165000
12 1000000 – 1500000 quote 78.0000% 1.20x 345000
13 1500000 – ∞ quote 90.0000% 1.05x 525000

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h (00:00 · 08:00 · 16:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
M_USDT
Mark price
0.8099
Tick size
0.0001
Lot size
0

The same asset elsewhere

Venue Contract Rate period Annualised
Aster MUSDT 4h +10.95%
Binance MUSDT 4h +10.95%
Bitget MUSDT 4h +10.95%
Bybit MUSDT 4h +10.95%
Gate this page M_USDT 8h +10.95%

M By venue →

Common questions

What is the Gate M funding rate?

The latest collected Gate M funding rate is +0.0100% per 8h rate period, or +10.95% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate M?

The collected settlement interval is 8h, normally 3 times a day. Settlements fall at 00:00, 08:00 and 16:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Gate M?

The collected leverage cap for Gate M is 10x, with 13 margin tiers shown. The first margin tier, up to 10K USDT, allows 10x; the second allows 9x.

What is the maintenance margin rate on Gate M?

The first tier requires 8.0000%, with 13 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Observation time and verification

This contract’s funding was observed at 2026-10-15 04:54 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology