English

Gate HYPE perpetual

HYPE_USDT

Use this contract in the calculator →

As of 2026-10-21 21:08 UTC, HYPE_USDT on Gate has a collected rate of -0.0043% over 4h, or -9.42% simple annualised; its collected settlement interval is 4h, with up to 75x leverage.

Rate
-0.0043%
Rate period: 4h
Annualised
-9.42%
23.7M 24h turnover
Max leverage
75x
20 Tier
30d realised APR
+2.89%
179 settlements

Settled rates over the past 30 days

Annualised · +2.89% · range -20.6% … +11.0% · 179 settlements

Settled funding for HYPE_USDT

The latest 30-day window contains 179 settlements covering 716 known-period hours, with a cumulative rate of +0.2362%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-10-21 16:00+0.0011%4h
2026-10-21 12:00+0.0001%4h
2026-10-21 08:00+0.0006%4h
2026-10-21 04:00+0.0003%4h
2026-10-21 00:00+0.0001%4h
2026-10-20 20:00+0.0028%4h
2026-10-20 16:00+0.0015%4h
2026-10-20 12:00+0.0042%4h
2026-10-20 08:00+0.0024%4h
2026-10-20 04:00+0.0050%4h
2026-10-20 00:00+0.0050%4h
2026-10-19 20:00+0.0031%4h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For HYPE_USDT, 10,000 USDT of notional × -0.004300% gives 0.4300 USDT over the quoted 4h rate period: longs receive and shorts pay. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for HYPE_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 20000 USDT. Above that, tier 2 requires 1.0000% maintenance margin.

Contract units and calculator input

One HYPE_USDT contract represents 0.1 HYPE. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 20000 quote 0.8333% 75.00x —
2 20000 – 50000 quote 1.0000% 60.00x 33.34
3 50000 – 100000 quote 1.2000% 50.00x 133.34
4 100000 – 200000 quote 1.5000% 40.00x 433.34
5 200000 – 300000 quote 1.8000% 35.00x 1033.34
6 300000 – 500000 quote 2.0000% 30.00x 1633.34
7 500000 – 1000000 quote 2.5000% 25.00x 4133.34
8 1000000 – 2000000 quote 3.5000% 20.00x 14133.34
9 2000000 – 3000000 quote 4.0000% 16.00x 24133.34
10 3000000 – 4000000 quote 5.0000% 12.00x 54133.34
11 4000000 – 5000000 quote 6.0000% 10.00x 94133.34
12 5000000 – 6000000 quote 8.0000% 8.00x 194133.34
13 6000000 – 7000000 quote 10.0000% 5.00x 314133.34
14 7000000 – 8000000 quote 15.0000% 4.00x 664133.34
15 8000000 – 10000000 quote 20.0000% 3.00x 1064133.34
16 10000000 – 20000000 quote 30.0000% 2.00x 2064133.34
17 20000000 – 25000000 quote 40.0000% 1.80x 4064133.34
18 25000000 – 30000000 quote 50.0000% 1.50x 6564133.34
19 30000000 – 35000000 quote 60.0000% 1.20x 9564133.34
20 35000000 – ∞ quote 80.0000% 1.05x 16564133.34

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h (00:00 · 04:00 · 08:00 · 12:00 · 16:00 · 20:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
HYPE_USDT
Mark price
81.2140
Tick size
0.001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Gate this page HYPE_USDT 4h -9.42%
Bybit HYPEPERP 4h -8.43%
Aster HYPEUSDT 4h -7.29%
Bitget HYPEUSDT 4h -4.60%
Binance HYPEUSDT 4h -2.20%
OKX HYPE-USDT-SWAP 8h +0.81%
Bybit HYPEUSDT 8h +7.70%
Lighter HYPE 8h +10.51%
Hyperliquid HYPE 1h +10.95%
OKX HYPE-USD-SWAP 8h +10.95%

HYPE By venue →

Common questions

What is the Gate HYPE funding rate?

The latest collected Gate HYPE funding rate is -0.0043% per 4h rate period, or -9.42% simple annualised. At this rate shorts pay longs.

How often is funding charged on Gate HYPE?

The collected settlement interval is 4h, normally 6 times a day. Settlements fall at 00:00, 04:00, 08:00, 12:00, 16:00 and 20:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Gate HYPE?

The collected leverage cap for Gate HYPE is 75x, with 20 margin tiers shown. The first margin tier, up to 20K USDT, allows 75x; the second allows 60x.

What is the maintenance margin rate on Gate HYPE?

The first tier requires 0.8333%, with 20 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

What has Gate HYPE funding paid over the past 30 days?

Settlements over the past 30 days annualise to +2.89% across 179 settlements, 32% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-10-21 21:08 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology

History coverage for this contract

179 settlements are available, covering 716 known-period hours, from 2026-09-22 00:00 to 2026-10-21 16:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.