Gate HUT perpetual
HUT_USDT
As of 2026-09-25 00:40 UTC, HUT_USDT on Gate has a collected rate of 0.0000% over 8h, or 0.00% simple annualised; its collected settlement interval is 8h, with up to 20x leverage.
What does this rate mean for a 10,000 USDT position?
For HUT_USDT, 10,000 USDT of notional × 0.000000% gives 0.0000 USDT over the quoted 8h rate period: neither side pays funding at this rate. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.
How do I select the margin tier for HUT_USDT?
This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 3.0000% maintenance margin.
Contract units and calculator input
One HUT_USDT contract represents 0.1 HUT. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.
Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.
Maintenance margin ladder
With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.
| Tier | Range | Maintenance rate | Max leverage | Deduction |
|---|---|---|---|---|
| 1 | 0 – 5000 quote | 2.5000% | 20.00x | — |
| 2 | 5000 – 10000 quote | 3.0000% | 16.00x | 25 |
| 3 | 10000 – 20000 quote | 3.5000% | 14.00x | 75 |
| 4 | 20000 – 30000 quote | 4.0000% | 12.00x | 175 |
| 5 | 30000 – 50000 quote | 5.0000% | 10.00x | 475 |
| 6 | 50000 – 70000 quote | 6.5000% | 8.00x | 1225 |
| 7 | 70000 – 100000 quote | 8.0000% | 6.00x | 2275 |
| 8 | 100000 – 200000 quote | 10.0000% | 5.00x | 4275 |
| 9 | 200000 – 300000 quote | 15.0000% | 4.00x | 14275 |
| 10 | 300000 – 500000 quote | 20.0000% | 3.00x | 29275 |
| 11 | 500000 – 1000000 quote | 25.0000% | 2.00x | 54275 |
| 12 | 1000000 – 1500000 quote | 40.0000% | 1.50x | 204275 |
| 13 | 1500000 – ∞ quote | 70.0000% | 1.05x | 654275 |
Contract specification
Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.
The same asset elsewhere
| Venue | Contract | Rate period | Annualised |
|---|---|---|---|
| Bitget | HUTUSDT | 8h | 0.00% |
| Bybit | HUTUSDT | 8h | 0.00% |
| Gate this page | HUT_USDT | 8h | 0.00% |
| OKX | HUT-USDT-SWAP | 8h | 0.00% |
Common questions
What is the Gate HUT funding rate?
The latest collected Gate HUT funding rate is 0.0000% per 8h rate period, or 0.00% simple annualised.
How often is funding charged on Gate HUT?
The collected settlement interval is 8h, normally 3 times a day. Venues can change it; confirm the next settlement time on the contract page.
What is the maximum leverage on Gate HUT?
The collected leverage cap for Gate HUT is 20x, with 13 margin tiers shown. The first margin tier, up to 5K USDT, allows 20x; the second allows 16x.
What is the maintenance margin rate on Gate HUT?
The first tier requires 2.5000%, with 13 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.
Observation time and verification
This contract’s funding was observed at 2026-09-25 00:40 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology
