English

Gate HBAR perpetual

HBAR_USDT

Use this contract in the calculator →

As of 2026-10-01 00:31 UTC, HBAR_USDT on Gate has a collected rate of +0.0013% over 8h, or +1.42% simple annualised; its collected settlement interval is 8h, with up to 75x leverage.

Rate
+0.0013%
Rate period: 8h
Annualised
+1.42%
6.8M 24h turnover
Max leverage
75x
14 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For HBAR_USDT, 10,000 USDT of notional × 0.001300% gives 0.1300 USDT over the quoted 8h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for HBAR_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 10000 USDT. Above that, tier 2 requires 1.0000% maintenance margin.

Contract units and calculator input

One HBAR_USDT contract represents 10 HBAR. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 10000 quote 0.6600% 75.00x —
2 10000 – 50000 quote 1.0000% 50.00x 34
3 50000 – 100000 quote 1.2000% 45.00x 134
4 100000 – 200000 quote 1.5000% 40.00x 434
5 200000 – 300000 quote 1.6600% 30.00x 754
6 300000 – 400000 quote 2.0000% 25.00x 1774
7 400000 – 800000 quote 2.5000% 20.00x 3774
8 800000 – 1500000 quote 3.3300% 15.00x 10414
9 1500000 – 3000000 quote 5.0000% 10.00x 35464
10 3000000 – 5000000 quote 7.6000% 6.60x 113464
11 5000000 – 8000000 quote 10.0000% 5.00x 233464
12 8000000 – 10000000 quote 12.5000% 4.00x 433464
13 10000000 – 12000000 quote 25.0000% 2.00x 1683464
14 12000000 – ∞ quote 50.0000% 1.05x 4683464

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
HBAR_USDT
Mark price
0.1036
Tick size
0.00001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Gate this page HBAR_USDT 8h +1.42%
OKX HBAR-USDT-SWAP 8h +3.54%
Lighter HBAR 8h +9.64%
Aster HBARUSDT 8h +10.95%
Binance HBARUSDC 4h +10.95%
Binance HBARUSDT 8h +10.95%
Bitget HBARUSDT 8h +10.95%
Bybit HBARPERP 4h +10.95%
Bybit HBARUSDT 8h +10.95%
Hyperliquid HBAR 1h +10.95%

HBAR By venue →

Common questions

What is the Gate HBAR funding rate?

The latest collected Gate HBAR funding rate is +0.0013% per 8h rate period, or +1.42% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate HBAR?

The collected settlement interval is 8h, normally 3 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate HBAR?

The collected leverage cap for Gate HBAR is 75x, with 14 margin tiers shown. The first margin tier, up to 10K USDT, allows 75x; the second allows 50x.

What is the maintenance margin rate on Gate HBAR?

The first tier requires 0.6600%, with 14 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Observation time and verification

This contract’s funding was observed at 2026-10-01 00:31 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology