English

OKX GPS perpetual

GPS-USDT-SWAP

Use this contract in the calculator →

As of 2026-10-15 05:59 UTC, GPS-USDT-SWAP on OKX has a collected rate of +0.0050% over 4h, or +10.95% simple annualised, with up to 20x leverage. Aster has a lower rate for longs at -58.31%.

Rate
+0.0050%
Rate period: 4h
Annualised
+10.95%
4.3M 24h turnover
Max leverage
20x
87 Tier
30d realised APR
+12.29%
179 settlements

Settled rates over the past 30 days

Annualised · +12.29% · range +11.0% … +131.3% · 179 settlements

Settled funding for GPS-USDT-SWAP

The latest 30-day window contains 179 settlements covering 716 known-period hours, with a cumulative rate of +1.0044%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-10-15 00:00+0.0050%4h
2026-10-14 20:00+0.0050%4h
2026-10-14 16:00+0.0050%4h
2026-10-14 12:00+0.0050%4h
2026-10-14 08:00+0.0050%4h
2026-10-14 04:00+0.0050%4h
2026-10-14 00:00+0.0050%4h
2026-10-13 20:00+0.0050%4h
2026-10-13 16:00+0.0050%4h
2026-10-13 12:00+0.0050%4h
2026-10-13 08:00+0.0050%4h
2026-10-13 04:00+0.0050%4h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For GPS-USDT-SWAP, 10,000 USDT of notional × 0.005000% gives 0.5000 USDT over the quoted 4h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for GPS-USDT-SWAP?

This table selects tiers by base-asset quantity in GPS, not by the amount of margin deposited. The first tier starts at 0 and ends at 850000 GPS. Above that, tier 2 requires 3.0000% maintenance margin.

Contract units and calculator input

One GPS-USDT-SWAP contract represents 10 GPS. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Maintenance margin ladder

No deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 850000 base 2.0000% 20.00x —
2 850010 – 1700000 base 3.0000% 15.00x —
3 1700010 – 2550000 base 4.0000% 12.50x —
4 2550010 – 3400000 base 4.5000% 11.76x —
5 3400010 – 4250000 base 5.0000% 11.11x —
6 4250010 – 5100000 base 5.5000% 10.52x —
7 5100010 – 5950000 base 6.0000% 10.00x —
8 5950010 – 6800000 base 6.5000% 9.52x —
9 6800010 – 7650000 base 7.0000% 9.09x —
10 7650010 – 8500000 base 7.5000% 8.69x —
11 8500010 – 9350000 base 8.0000% 8.33x —
12 9350010 – 10200000 base 8.5000% 8.00x —
13 10200010 – 11050000 base 9.0000% 7.69x —
14 11050010 – 11900000 base 9.5000% 7.40x —
15 11900010 – 12750000 base 10.0000% 7.14x —
16 12750010 – 13600000 base 10.5000% 6.89x —
17 13600010 – 14450000 base 11.0000% 6.66x —
18 14450010 – 15300000 base 11.5000% 6.45x —
19 15300010 – 16150000 base 12.0000% 6.25x —
20 16150010 – 17000000 base 12.5000% 6.06x —
21 17000010 – 17850000 base 13.0000% 5.88x —
22 17850010 – 18700000 base 13.5000% 5.71x —
23 18700010 – 19550000 base 14.0000% 5.55x —
24 19550010 – 20400000 base 14.5000% 5.40x —
25 20400010 – 21250000 base 15.0000% 5.26x —
26 21250010 – 22100000 base 15.5000% 5.12x —
27 22100010 – 22950000 base 16.0000% 5.00x —
28 22950010 – 23800000 base 16.5000% 4.87x —
29 23800010 – 24650000 base 17.0000% 4.76x —
30 24650010 – 25500000 base 17.5000% 4.65x —
31 25500010 – 26350000 base 18.0000% 4.54x —
32 26350010 – 27200000 base 18.5000% 4.44x —
33 27200010 – 28050000 base 19.0000% 4.34x —
34 28050010 – 28900000 base 19.5000% 4.25x —
35 28900010 – 29750000 base 20.0000% 4.16x —
36 29750010 – 30600000 base 20.5000% 4.08x —
37 30600010 – 31450000 base 21.0000% 4.00x —
38 31450010 – 32300000 base 21.5000% 3.92x —
39 32300010 – 33150000 base 22.0000% 3.84x —
40 33150010 – 34000000 base 22.5000% 3.77x —
41 34000010 – 34850000 base 23.0000% 3.70x —
42 34850010 – 35700000 base 23.5000% 3.63x —
43 35700010 – 36550000 base 24.0000% 3.57x —
44 36550010 – 37400000 base 24.5000% 3.50x —
45 37400010 – 38250000 base 25.0000% 3.44x —
46 38250010 – 39100000 base 25.5000% 3.38x —
47 39100010 – 39950000 base 26.0000% 3.33x —
48 39950010 – 40800000 base 26.5000% 3.27x —
49 40800010 – 41650000 base 27.0000% 3.22x —
50 41650010 – 42500000 base 27.5000% 3.17x —
51 42500010 – 43350000 base 28.0000% 3.12x —
52 43350010 – 44200000 base 28.5000% 3.07x —
53 44200010 – 45050000 base 29.0000% 3.03x —
54 45050010 – 45900000 base 29.5000% 2.98x —
55 45900010 – 46750000 base 30.0000% 2.94x —
56 46750010 – 47600000 base 30.5000% 2.89x —
57 47600010 – 48450000 base 31.0000% 2.85x —
58 48450010 – 49300000 base 31.5000% 2.81x —
59 49300010 – 50150000 base 32.0000% 2.77x —
60 50150010 – 51000000 base 32.5000% 2.73x —
61 51000010 – 51850000 base 33.0000% 2.70x —
62 51850010 – 52700000 base 33.5000% 2.66x —
63 52700010 – 53550000 base 34.0000% 2.63x —
64 53550010 – 54400000 base 34.5000% 2.59x —
65 54400010 – 55250000 base 35.0000% 2.56x —
66 55250010 – 56100000 base 35.5000% 2.53x —
67 56100010 – 56950000 base 36.0000% 2.50x —
68 56950010 – 57800000 base 36.5000% 2.46x —
69 57800010 – 58650000 base 37.0000% 2.43x —
70 58650010 – 59500000 base 37.5000% 2.40x —
71 59500010 – 60350000 base 38.0000% 2.38x —
72 60350010 – 61200000 base 38.5000% 2.35x —
73 61200010 – 62050000 base 39.0000% 2.32x —
74 62050010 – 62900000 base 39.5000% 2.29x —
75 62900010 – 63750000 base 40.0000% 2.27x —
76 63750010 – 64600000 base 40.5000% 2.24x —
77 64600010 – 65450000 base 41.0000% 2.22x —
78 65450010 – 66300000 base 41.5000% 2.19x —
79 66300010 – 67150000 base 42.0000% 2.17x —
80 67150010 – 68000000 base 42.5000% 2.15x —
81 68000010 – 68850000 base 43.0000% 2.12x —
82 68850010 – 69700000 base 43.5000% 2.10x —
83 69700010 – 70550000 base 44.0000% 2.08x —
84 70550010 – 71400000 base 44.5000% 2.06x —
85 71400010 – 72250000 base 45.0000% 2.04x —
86 72250010 – 73100000 base 45.5000% 2.02x —
87 73100010 – 73950000 base 46.0000% 2.00x —

Contract specification

Quote currency: USDT · Settlement currency: USDT. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
GPS-USDT-SWAP
Mark price
0.0078
Tick size
0.000001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Aster GPSUSDT 4h -58.31%
Binance GPSUSDT 4h +10.95%
Bitget GPSUSDT 4h +10.95%
Bybit GPSUSDT 4h +10.95%
Gate GPS_USDT 8h +10.95%
OKX this page GPS-USDT-SWAP 4h +10.95%

GPS By venue →

Common questions

What is the OKX GPS funding rate?

The latest collected OKX GPS funding rate is +0.0050% per 4h rate period, or +10.95% simple annualised. At this rate longs pay shorts.

What is the maximum leverage on OKX GPS?

The collected leverage cap for OKX GPS is 20x, with 87 margin tiers shown. The first margin tier, up to 850000 GPS, allows 20x; the second allows 15x.

What is the maintenance margin rate on OKX GPS?

The first tier requires 2.0000%, with 87 available tiers. The applicable requirement depends on the position’s tier. This venue applies no deduction: maintenance margin = notional × the rate of the tier the position falls in.

Which venue has the lowest GPS funding cost for longs?

For a long position, Aster currently has the lowest rate at -58.31% annualised; this page's OKX is at +10.95%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

What has OKX GPS funding paid over the past 30 days?

Settlements over the past 30 days annualise to +12.29% across 179 settlements, 0% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-10-15 05:59 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. OKX official data source · Funding methodology

History coverage for this contract

179 settlements are available, covering 716 known-period hours, from 2026-09-15 08:00 to 2026-10-15 00:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.