English

Gate FF perpetual

FF_USDT

Use this contract in the calculator →

As of 2026-10-01 00:31 UTC, FF_USDT on Gate has a collected rate of +0.0050% over 4h, or +10.95% simple annualised; its collected settlement interval is 4h, with up to 50x leverage. Lighter has a lower rate for longs at +10.51%.

Rate
+0.0050%
Rate period: 4h
Annualised
+10.95%
1.5M 24h turnover
Max leverage
50x
17 Tier
30d realised APR
+44.73%
49 settlements

Settled rates over the past 30 days

Annualised · +44.73% · range +11.0% … +235.0% · 49 settlements

Settled funding for FF_USDT

The latest 30-day window contains 49 settlements covering 196 known-period hours, with a cumulative rate of +1.0009%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-09-09 04:00+0.0680%4h
2026-09-09 00:00+0.0988%4h
2026-09-08 20:00+0.0763%4h
2026-09-08 16:00+0.0864%4h
2026-09-08 12:00+0.1073%4h
2026-09-08 08:00+0.0331%4h
2026-09-08 04:00+0.0101%4h
2026-09-08 00:00+0.0595%4h
2026-09-07 20:00+0.0289%4h
2026-09-07 16:00+0.0342%4h
2026-09-07 12:00+0.0050%4h
2026-09-07 08:00+0.0050%4h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For FF_USDT, 10,000 USDT of notional × 0.005000% gives 0.5000 USDT over the quoted 4h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for FF_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 1.5000% maintenance margin.

Contract units and calculator input

One FF_USDT contract represents 10 FF. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 1.0000% 50.00x —
2 5000 – 7000 quote 1.5000% 40.00x 25
3 7000 – 10000 quote 2.5000% 25.00x 95
4 10000 – 20000 quote 4.0000% 20.00x 245
5 20000 – 30000 quote 6.5000% 12.00x 745
6 30000 – 50000 quote 8.0000% 10.00x 1195
7 50000 – 70000 quote 10.0000% 8.00x 2195
8 70000 – 100000 quote 12.0000% 6.00x 3595
9 100000 – 150000 quote 16.0000% 5.00x 7595
10 150000 – 200000 quote 20.0000% 4.00x 13595
11 200000 – 300000 quote 25.0000% 3.30x 23595
12 300000 – 500000 quote 28.0000% 3.00x 32595
13 500000 – 700000 quote 35.0000% 2.50x 67595
14 700000 – 1000000 quote 45.0000% 2.00x 137595
15 1000000 – 1500000 quote 60.0000% 1.50x 287595
16 1500000 – 2000000 quote 78.0000% 1.20x 557595
17 2000000 – ∞ quote 90.0000% 1.05x 797595

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
FF_USDT
Mark price
0.1303
Tick size
0.00001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Lighter FF 8h +10.51%
Aster FFUSDT 4h +10.95%
Binance FFUSDT 4h +10.95%
Bitget FFUSDT 4h +10.95%
Bybit FFUSDT 4h +10.95%
Gate this page FF_USDT 4h +10.95%

FF By venue →

Common questions

What is the Gate FF funding rate?

The latest collected Gate FF funding rate is +0.0050% per 4h rate period, or +10.95% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate FF?

The collected settlement interval is 4h, normally 6 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate FF?

The collected leverage cap for Gate FF is 50x, with 17 margin tiers shown. The first margin tier, up to 5K USDT, allows 50x; the second allows 40x.

What is the maintenance margin rate on Gate FF?

The first tier requires 1.0000%, with 17 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Which venue has the lowest FF funding cost for longs?

For a long position, Lighter currently has the lowest rate at +10.51% annualised; this page's Gate is at +10.95%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

What has Gate FF funding paid over the past 30 days?

Settlements over the past 30 days annualise to +44.73% across 49 settlements, 0% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-10-01 00:31 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology

History coverage for this contract

49 settlements are available, covering 196 known-period hours, from 2026-09-01 04:00 to 2026-09-09 04:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.