English

Gate FET perpetual

FET_USDT

Use this contract in the calculator →

As of 2026-10-01 00:31 UTC, FET_USDT on Gate has a collected rate of +0.0100% over 8h, or +10.95% simple annualised; its collected settlement interval is 8h, with up to 50x leverage.

Rate
+0.0100%
Rate period: 8h
Annualised
+10.95%
6.5M 24h turnover
Max leverage
50x
15 Tier
30d realised APR
+3.94%
24 settlements

Settled rates over the past 30 days

Annualised · +3.94% · range -17.8% … +11.0% · 24 settlements

Settled funding for FET_USDT

The latest 30-day window contains 24 settlements covering 192 known-period hours, with a cumulative rate of +0.0864%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-09-09 00:00+0.0100%8h
2026-09-08 16:00+0.0100%8h
2026-09-08 08:00+0.0100%8h
2026-09-08 00:00+0.0100%8h
2026-09-07 16:00+0.0100%8h
2026-09-07 08:00+0.0100%8h
2026-09-07 00:00-0.0163%8h
2026-09-06 16:00-0.0142%8h
2026-09-06 08:00-0.0002%8h
2026-09-06 00:00+0.0100%8h
2026-09-05 16:00+0.0100%8h
2026-09-05 08:00+0.0100%8h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For FET_USDT, 10,000 USDT of notional × 0.010000% gives 1.0000 USDT over the quoted 8h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for FET_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 10000 USDT. Above that, tier 2 requires 1.5000% maintenance margin.

Contract units and calculator input

One FET_USDT contract represents 1 FET. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 10000 quote 1.0000% 50.00x —
2 10000 – 20000 quote 1.5000% 40.00x 50
3 20000 – 50000 quote 2.0000% 30.00x 150
4 50000 – 100000 quote 2.5000% 25.00x 400
5 100000 – 500000 quote 3.5000% 20.00x 1400
6 500000 – 1000000 quote 5.0000% 15.00x 8900
7 1000000 – 2000000 quote 6.0000% 12.00x 18900
8 2000000 – 5000000 quote 8.0000% 10.00x 58900
9 5000000 – 7000000 quote 10.0000% 8.00x 158900
10 7000000 – 10000000 quote 15.0000% 5.00x 508900
11 10000000 – 20000000 quote 28.0000% 3.00x 1808900
12 20000000 – 30000000 quote 45.0000% 2.00x 5208900
13 30000000 – 40000000 quote 60.0000% 1.50x 9708900
14 40000000 – 50000000 quote 78.0000% 1.20x 16908900
15 50000000 – ∞ quote 90.0000% 1.05x 22908900

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
FET_USDT
Mark price
0.2274
Tick size
0.0001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Aster FETUSDT 8h +10.95%
Binance FETUSDT 8h +10.95%
Bitget FETUSDT 8h +10.95%
Gate this page FET_USDT 8h +10.95%
OKX FET-USDT-SWAP 4h +10.95%
Hyperliquid FET 1h +53.63%

FET By venue →

Common questions

What is the Gate FET funding rate?

The latest collected Gate FET funding rate is +0.0100% per 8h rate period, or +10.95% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate FET?

The collected settlement interval is 8h, normally 3 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate FET?

The collected leverage cap for Gate FET is 50x, with 15 margin tiers shown. The first margin tier, up to 10K USDT, allows 50x; the second allows 40x.

What is the maintenance margin rate on Gate FET?

The first tier requires 1.0000%, with 15 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

What has Gate FET funding paid over the past 30 days?

Settlements over the past 30 days annualise to +3.94% across 24 settlements, 29% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-10-01 00:31 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology

History coverage for this contract

24 settlements are available, covering 192 known-period hours, from 2026-09-01 08:00 to 2026-09-09 00:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.