English

Gate FATCOIN perpetual

FATCOIN_USDT

Use this contract in the calculator →

As of 2026-11-10 23:45 UTC, FATCOIN_USDT on Gate has a collected rate of +0.0361% over 1h, or +316.24% simple annualised; its collected settlement interval is 1h, with up to 5x leverage.

Rate
+0.0361%
Rate period: 1h
Annualised
+316.24%
68.0K 24h turnover
Max leverage
5x
14 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For FATCOIN_USDT, 10,000 USDT of notional × 0.036100% gives 3.6100 USDT over the quoted 1h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for FATCOIN_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 1000 USDT. Above that, tier 2 requires 20.0000% maintenance margin.

Contract units and calculator input

One FATCOIN_USDT contract represents 100 FATCOIN. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 1000 quote 15.0000% 5.00x —
2 1000 – 2000 quote 20.0000% 4.00x 50
3 2000 – 3000 quote 25.0000% 3.30x 150
4 3000 – 5000 quote 30.0000% 3.00x 300
5 5000 – 10000 quote 35.0000% 2.50x 550
6 10000 – 20000 quote 40.0000% 2.22x 1050
7 20000 – 30000 quote 45.0000% 2.00x 2050
8 30000 – 50000 quote 50.0000% 1.80x 3550
9 50000 – 100000 quote 60.0000% 1.50x 8550
10 100000 – 200000 quote 65.0000% 1.42x 13550
11 200000 – 300000 quote 70.0000% 1.33x 23550
12 300000 – 500000 quote 75.0000% 1.25x 38550
13 500000 – 1000000 quote 85.0000% 1.11x 88550
14 1000000 – ∞ quote 90.0000% 1.05x 138550

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 1h (on the hour, UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
FATCOIN_USDT
Mark price
0.0001
Tick size
0.00001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Gate this page FATCOIN_USDT 1h +316.24%

FATCOIN By venue →

Common questions

What is the Gate FATCOIN funding rate?

The latest collected Gate FATCOIN funding rate is +0.0361% per 1h rate period, or +316.24% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate FATCOIN?

The collected settlement interval is 1h, normally 24 times a day. It settles on the hour (UTC). Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Gate FATCOIN?

The collected leverage cap for Gate FATCOIN is 5x, with 14 margin tiers shown. The first margin tier, up to 1K USDT, allows 5x; the second allows 4x.

What is the maintenance margin rate on Gate FATCOIN?

The first tier requires 15.0000%, with 14 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Observation time and verification

This contract’s funding was observed at 2026-11-10 23:45 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology