English

Gate ETHFI perpetual

ETHFI_USDT

Use this contract in the calculator →

As of 2026-10-21 21:56 UTC, ETHFI_USDT on Gate has a collected rate of -0.0085% over 4h, or -18.62% simple annualised; its collected settlement interval is 4h, with up to 75x leverage.

Rate
-0.0085%
Rate period: 4h
Annualised
-18.62%
1.9M 24h turnover
Max leverage
75x
18 Tier
30d realised APR
+6.00%
179 settlements

Settled rates over the past 30 days

Annualised · +6.00% · range -32.9% … +11.0% · 179 settlements

Settled funding for ETHFI_USDT

The latest 30-day window contains 179 settlements covering 716 known-period hours, with a cumulative rate of +0.4902%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-10-21 16:00-0.0032%4h
2026-10-21 12:00-0.0032%4h
2026-10-21 08:00-0.0005%4h
2026-10-21 04:00-0.0054%4h
2026-10-21 00:00-0.0022%4h
2026-10-20 20:00+0.0006%4h
2026-10-20 16:00+0.0050%4h
2026-10-20 12:00-0.0058%4h
2026-10-20 08:00+0.0016%4h
2026-10-20 04:00+0.0031%4h
2026-10-20 00:00-0.0002%4h
2026-10-19 20:00+0.0050%4h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For ETHFI_USDT, 10,000 USDT of notional × -0.008500% gives 0.8500 USDT over the quoted 4h rate period: longs receive and shorts pay. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for ETHFI_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 1.0000% maintenance margin.

Contract units and calculator input

One ETHFI_USDT contract represents 0.1 ETHFI. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 0.8333% 75.00x —
2 5000 – 10000 quote 1.0000% 50.00x 8.335
3 10000 – 20000 quote 1.5000% 40.00x 58.335
4 20000 – 30000 quote 2.0000% 30.00x 158.335
5 30000 – 50000 quote 2.5000% 25.00x 308.335
6 50000 – 70000 quote 3.0000% 20.00x 558.335
7 70000 – 100000 quote 4.0000% 16.00x 1258.335
8 100000 – 150000 quote 5.0000% 14.00x 2258.335
9 150000 – 200000 quote 6.0000% 12.00x 3758.335
10 200000 – 300000 quote 8.0000% 10.00x 7758.335
11 300000 – 500000 quote 10.0000% 8.00x 13758.335
12 500000 – 700000 quote 12.0000% 6.00x 23758.335
13 700000 – 1000000 quote 15.0000% 5.00x 44758.335
14 1000000 – 2000000 quote 20.0000% 4.00x 94758.335
15 2000000 – 3000000 quote 30.0000% 3.00x 294758.335
16 3000000 – 5000000 quote 45.0000% 2.00x 744758.335
17 5000000 – 7000000 quote 60.0000% 1.50x 1494758.335
18 7000000 – ∞ quote 90.0000% 1.05x 3594758.335

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h (00:00 · 04:00 · 08:00 · 12:00 · 16:00 · 20:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
ETHFI_USDT
Mark price
0.7236
Tick size
0.0001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Gate this page ETHFI_USDT 4h -18.62%
Binance ETHFIUSDT 4h +3.97%
OKX ETHFI-USDT-SWAP 4h +6.61%
Aster ETHFIUSDT 4h +9.05%
Lighter ETHFI 8h +10.51%
Binance ETHFIUSDC 4h +10.95%
Bitget ETHFIUSDT 4h +10.95%
Bybit ETHFIPERP 8h +10.95%
Bybit ETHFIUSDT 4h +10.95%
Hyperliquid ETHFI 1h +10.95%

ETHFI By venue →

Common questions

What is the Gate ETHFI funding rate?

The latest collected Gate ETHFI funding rate is -0.0085% per 4h rate period, or -18.62% simple annualised. At this rate shorts pay longs.

How often is funding charged on Gate ETHFI?

The collected settlement interval is 4h, normally 6 times a day. Settlements fall at 00:00, 04:00, 08:00, 12:00, 16:00 and 20:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Gate ETHFI?

The collected leverage cap for Gate ETHFI is 75x, with 18 margin tiers shown. The first margin tier, up to 5K USDT, allows 75x; the second allows 50x.

What is the maintenance margin rate on Gate ETHFI?

The first tier requires 0.8333%, with 18 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

What has Gate ETHFI funding paid over the past 30 days?

Settlements over the past 30 days annualise to +6.00% across 179 settlements, 21% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-10-21 21:56 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology

History coverage for this contract

179 settlements are available, covering 716 known-period hours, from 2026-09-22 00:00 to 2026-10-21 16:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.