English

Gate ETC perpetual

ETC_USDT

Use this contract in the calculator →

As of 2026-10-01 02:05 UTC, ETC_USDT on Gate has a collected rate of +0.0100% over 8h, or +10.95% simple annualised; its collected settlement interval is 8h, with up to 60x leverage. OKX has a lower rate for longs at -17.79%.

Rate
+0.0100%
Rate period: 8h
Annualised
+10.95%
2.6M 24h turnover
Max leverage
60x
19 Tier
30d realised APR
+10.04%
24 settlements

Settled rates over the past 30 days

Annualised · +10.04% · range -2.7% … +11.0% · 24 settlements

Settled funding for ETC_USDT

The latest 30-day window contains 24 settlements covering 192 known-period hours, with a cumulative rate of +0.2200%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-09-09 00:00+0.0100%8h
2026-09-08 16:00+0.0100%8h
2026-09-08 08:00+0.0100%8h
2026-09-08 00:00+0.0100%8h
2026-09-07 16:00+0.0100%8h
2026-09-07 08:00+0.0100%8h
2026-09-07 00:00+0.0100%8h
2026-09-06 16:00+0.0063%8h
2026-09-06 08:00-0.0025%8h
2026-09-06 00:00+0.0100%8h
2026-09-05 16:00+0.0100%8h
2026-09-05 08:00+0.0100%8h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For ETC_USDT, 10,000 USDT of notional × 0.010000% gives 1.0000 USDT over the quoted 8h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for ETC_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 50000 USDT. Above that, tier 2 requires 1.0000% maintenance margin.

Contract units and calculator input

One ETC_USDT contract represents 0.1 ETC. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 50000 quote 0.8000% 60.00x —
2 50000 – 100000 quote 1.0000% 50.00x 100
3 100000 – 150000 quote 1.5000% 40.00x 600
4 150000 – 200000 quote 2.0000% 30.00x 1350
5 200000 – 250000 quote 3.0000% 25.00x 3350
6 250000 – 300000 quote 3.3000% 23.00x 4100
7 300000 – 350000 quote 3.6000% 21.00x 5000
8 350000 – 400000 quote 4.0000% 20.00x 6400
9 400000 – 450000 quote 5.0000% 16.00x 10400
10 450000 – 500000 quote 6.0000% 14.00x 14900
11 500000 – 700000 quote 7.0000% 12.00x 19900
12 700000 – 1000000 quote 8.0000% 10.00x 26900
13 1000000 – 1500000 quote 14.0000% 6.00x 86900
14 1500000 – 2000000 quote 18.0000% 5.00x 146900
15 2000000 – 2500000 quote 30.0000% 3.00x 386900
16 2500000 – 3000000 quote 40.0000% 2.20x 636900
17 3000000 – 4000000 quote 45.0000% 2.00x 786900
18 4000000 – 5000000 quote 75.0000% 1.25x 1986900
19 5000000 – ∞ quote 95.0000% 1.00x 2986900

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
ETC_USDT
Mark price
8.8740
Tick size
0.001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
OKX ETC-USDT-SWAP 8h -17.79%
Bybit ETCUSDT 8h -13.23%
Binance ETCUSDT 8h +5.00%
Aster ETCUSDT 8h +10.95%
Bitget ETCUSDT 8h +10.95%
Bybit ETCPERP 8h +10.95%
Gate this page ETC_USDT 8h +10.95%
Hyperliquid ETC 1h +10.95%
OKX ETC-USD-SWAP 8h +10.95%

ETC By venue →

Common questions

What is the Gate ETC funding rate?

The latest collected Gate ETC funding rate is +0.0100% per 8h rate period, or +10.95% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate ETC?

The collected settlement interval is 8h, normally 3 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate ETC?

The collected leverage cap for Gate ETC is 60x, with 19 margin tiers shown. The first margin tier, up to 50K USDT, allows 60x; the second allows 50x.

What is the maintenance margin rate on Gate ETC?

The first tier requires 0.8000%, with 19 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Which venue has the lowest ETC funding cost for longs?

For a long position, OKX currently has the lowest rate at -17.79% annualised; this page's Gate is at +10.95%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

What has Gate ETC funding paid over the past 30 days?

Settlements over the past 30 days annualise to +10.04% across 24 settlements, 4% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-10-01 02:05 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology

History coverage for this contract

24 settlements are available, covering 192 known-period hours, from 2026-09-01 08:00 to 2026-09-09 00:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.