English

Gate ENA perpetual

ENA_USDT

Use this contract in the calculator →

As of 2026-09-30 23:44 UTC, ENA_USDT on Gate has a collected rate of +0.0050% over 4h, or +10.95% simple annualised; its collected settlement interval is 4h, with up to 50x leverage.

Rate
+0.0050%
Rate period: 4h
Annualised
+10.95%
21.9M 24h turnover
Max leverage
50x
15 Tier
30d realised APR
+6.37%
50 settlements

Settled rates over the past 30 days

Annualised · +6.37% · range -13.4% … +11.0% · 50 settlements

Settled funding for ENA_USDT

The latest 30-day window contains 50 settlements covering 200 known-period hours, with a cumulative rate of +0.1454%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-09-09 04:00+0.0050%4h
2026-09-09 00:00+0.0050%4h
2026-09-08 20:00+0.0050%4h
2026-09-08 16:00+0.0050%4h
2026-09-08 12:00+0.0050%4h
2026-09-08 08:00+0.0050%4h
2026-09-08 04:00+0.0027%4h
2026-09-08 00:00+0.0050%4h
2026-09-07 20:00-0.0021%4h
2026-09-07 16:00-0.0001%4h
2026-09-07 12:00+0.0050%4h
2026-09-07 08:00+0.0050%4h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For ENA_USDT, 10,000 USDT of notional × 0.005000% gives 0.5000 USDT over the quoted 4h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for ENA_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 20000 USDT. Above that, tier 2 requires 1.2000% maintenance margin.

Contract units and calculator input

One ENA_USDT contract represents 10 ENA. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 20000 quote 1.0000% 50.00x —
2 20000 – 30000 quote 1.2000% 45.00x 40
3 30000 – 50000 quote 1.5000% 40.00x 130
4 50000 – 100000 quote 2.0000% 33.00x 380
5 100000 – 200000 quote 2.1000% 32.00x 480
6 200000 – 300000 quote 2.3000% 30.00x 880
7 300000 – 500000 quote 2.5000% 28.00x 1480
8 500000 – 1000000 quote 3.0000% 25.00x 3980
9 1000000 – 2000000 quote 3.5000% 20.00x 8980
10 2000000 – 5000000 quote 4.0000% 15.00x 18980
11 5000000 – 7000000 quote 5.0000% 10.00x 68980
12 7000000 – 10000000 quote 10.0000% 5.00x 418980
13 10000000 – 15000000 quote 18.0000% 3.00x 1218980
14 15000000 – 20000000 quote 25.0000% 2.00x 2268980
15 20000000 – ∞ quote 50.0000% 1.05x 7268980

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
ENA_USDT
Mark price
0.2650
Tick size
0.00001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Aster ENAUSDT 4h +10.95%
Binance ENAUSDC 4h +10.95%
Binance ENAUSDT 4h +10.95%
Bitget ENAUSDT 4h +10.95%
Bybit ENAPERP 8h +10.95%
Bybit ENAUSDT 4h +10.95%
Gate this page ENA_USDT 4h +10.95%
Hyperliquid ENA 1h +10.95%
OKX ENA-USDT-SWAP 4h +10.95%
Lighter ENA 8h +32.41%

ENA By venue →

Common questions

What is the Gate ENA funding rate?

The latest collected Gate ENA funding rate is +0.0050% per 4h rate period, or +10.95% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate ENA?

The collected settlement interval is 4h, normally 6 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate ENA?

The collected leverage cap for Gate ENA is 50x, with 15 margin tiers shown. The first margin tier, up to 20K USDT, allows 50x; the second allows 45x.

What is the maintenance margin rate on Gate ENA?

The first tier requires 1.0000%, with 15 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

What has Gate ENA funding paid over the past 30 days?

Settlements over the past 30 days annualise to +6.37% across 50 settlements, 16% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-09-30 23:44 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology

History coverage for this contract

50 settlements are available, covering 200 known-period hours, from 2026-09-01 00:00 to 2026-09-09 04:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.