English

Gate EGLD perpetual

EGLD_USDT

Use this contract in the calculator →

As of 2026-10-15 05:57 UTC, EGLD_USDT on Gate has a collected rate of -0.0904% over 8h, or -98.99% simple annualised; its collected settlement interval is 8h, with up to 30x leverage.

Rate
-0.0904%
Rate period: 8h
Annualised
-98.99%
218.7K 24h turnover
Max leverage
30x
10 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For EGLD_USDT, 10,000 USDT of notional × -0.090400% gives 9.0400 USDT over the quoted 8h rate period: longs receive and shorts pay. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for EGLD_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 10000 USDT. Above that, tier 2 requires 3.5000% maintenance margin.

Contract units and calculator input

One EGLD_USDT contract represents 0.1 EGLD. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 10000 quote 2.0000% 30.00x —
2 10000 – 20000 quote 3.5000% 20.00x 150
3 20000 – 30000 quote 4.5000% 16.00x 350
4 30000 – 40000 quote 5.5000% 14.00x 650
5 40000 – 50000 quote 6.5000% 12.50x 1050
6 50000 – 70000 quote 8.0000% 10.00x 1800
7 70000 – 100000 quote 30.0000% 2.80x 17200
8 100000 – 150000 quote 35.0000% 2.50x 22200
9 150000 – 200000 quote 45.0000% 2.00x 37200
10 200000 – ∞ quote 95.0000% 1.00x 137200

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h (00:00 · 08:00 · 16:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
EGLD_USDT
Mark price
3.4770
Tick size
0.001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Gate this page EGLD_USDT 8h -98.99%
Bybit EGLDUSDT 8h -16.49%
OKX EGLD-USDT-SWAP 8h -16.39%
Bitget EGLDUSDT 8h -6.13%
Binance EGLDUSDT 8h -2.12%

EGLD By venue →

Common questions

What is the Gate EGLD funding rate?

The latest collected Gate EGLD funding rate is -0.0904% per 8h rate period, or -98.99% simple annualised. At this rate shorts pay longs.

How often is funding charged on Gate EGLD?

The collected settlement interval is 8h, normally 3 times a day. Settlements fall at 00:00, 08:00 and 16:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Gate EGLD?

The collected leverage cap for Gate EGLD is 30x, with 10 margin tiers shown. The first margin tier, up to 10K USDT, allows 30x; the second allows 20x.

What is the maintenance margin rate on Gate EGLD?

The first tier requires 2.0000%, with 10 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Observation time and verification

This contract’s funding was observed at 2026-10-15 05:57 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology