English

Gate EACC perpetual

EACC_USDT

Use this contract in the calculator →

As of 2026-10-01 01:02 UTC, EACC_USDT on Gate has a collected rate of -1.3770% over 1h, or -12062.52% simple annualised; its collected settlement interval is 1h, with up to 10x leverage.

Rate
-1.3770%
Rate period: 1h
Annualised
-12062.52%
2.4M 24h turnover
Max leverage
10x
19 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For EACC_USDT, 10,000 USDT of notional × -1.377000% gives 137.7000 USDT over the quoted 1h rate period: longs receive and shorts pay. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for EACC_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 6.0000% maintenance margin.

Contract units and calculator input

One EACC_USDT contract represents 1000 EACC. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 5.0000% 10.00x —
2 5000 – 10000 quote 6.0000% 9.00x 50
3 10000 – 15000 quote 7.0000% 8.00x 150
4 15000 – 20000 quote 8.0000% 7.50x 300
5 20000 – 25000 quote 10.0000% 7.00x 700
6 25000 – 30000 quote 12.0000% 6.00x 1200
7 30000 – 35000 quote 15.0000% 5.00x 2100
8 35000 – 40000 quote 18.0000% 4.50x 3150
9 40000 – 45000 quote 20.0000% 4.00x 3950
10 45000 – 50000 quote 22.0000% 3.50x 4850
11 50000 – 70000 quote 25.0000% 3.30x 6350
12 70000 – 100000 quote 28.0000% 3.00x 8450
13 100000 – 150000 quote 35.0000% 2.50x 15450
14 150000 – 200000 quote 45.0000% 2.00x 30450
15 200000 – 300000 quote 50.0000% 1.80x 40450
16 300000 – 400000 quote 60.0000% 1.50x 70450
17 400000 – 500000 quote 78.0000% 1.20x 142450
18 500000 – 700000 quote 85.0000% 1.10x 177450
19 700000 – ∞ quote 90.0000% 1.05x 212450

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 1h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
EACC_USDT
Mark price
0.0150
Tick size
0.000001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Gate this page EACC_USDT 1h -12062.52%

EACC By venue →

Common questions

What is the Gate EACC funding rate?

The latest collected Gate EACC funding rate is -1.3770% per 1h rate period, or -12062.52% simple annualised. At this rate shorts pay longs.

How often is funding charged on Gate EACC?

The collected settlement interval is 1h, normally 24 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate EACC?

The collected leverage cap for Gate EACC is 10x, with 19 margin tiers shown. The first margin tier, up to 5K USDT, allows 10x; the second allows 9x.

What is the maintenance margin rate on Gate EACC?

The first tier requires 5.0000%, with 19 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Observation time and verification

This contract’s funding was observed at 2026-10-01 01:02 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology