English

Gate DYDX perpetual

DYDX_USDT

Use this contract in the calculator →

As of 2026-10-15 04:54 UTC, DYDX_USDT on Gate has a collected rate of -0.0201% over 8h, or -22.01% simple annualised; its collected settlement interval is 8h, with up to 75x leverage.

Rate
-0.0201%
Rate period: 8h
Annualised
-22.01%
342.2K 24h turnover
Max leverage
75x
18 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For DYDX_USDT, 10,000 USDT of notional × -0.020100% gives 2.0100 USDT over the quoted 8h rate period: longs receive and shorts pay. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for DYDX_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 10000 USDT. Above that, tier 2 requires 1.0000% maintenance margin.

Contract units and calculator input

One DYDX_USDT contract represents 0.1 DYDX. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 10000 quote 0.8333% 75.00x —
2 10000 – 20000 quote 1.0000% 50.00x 16.67
3 20000 – 30000 quote 1.5000% 40.00x 116.67
4 30000 – 50000 quote 2.0000% 25.00x 266.67
5 50000 – 70000 quote 2.5000% 20.00x 516.67
6 70000 – 100000 quote 3.3000% 15.00x 1076.67
7 100000 – 150000 quote 4.0000% 12.50x 1776.67
8 150000 – 200000 quote 5.0000% 10.00x 3276.67
9 200000 – 300000 quote 6.5000% 8.00x 6276.67
10 300000 – 500000 quote 15.0000% 5.00x 31776.67
11 500000 – 700000 quote 20.0000% 4.00x 56776.67
12 700000 – 1000000 quote 25.0000% 3.00x 91776.67
13 1000000 – 1500000 quote 30.0000% 2.50x 141776.67
14 1500000 – 2000000 quote 40.0000% 2.00x 291776.67
15 2000000 – 3000000 quote 45.0000% 1.80x 391776.67
16 3000000 – 5000000 quote 55.0000% 1.50x 691776.67
17 5000000 – 7000000 quote 65.0000% 1.20x 1191776.67
18 7000000 – ∞ quote 80.0000% 1.05x 2241776.67

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h (00:00 · 08:00 · 16:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
DYDX_USDT
Mark price
0.1219
Tick size
0.00001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Gate this page DYDX_USDT 8h -22.01%
Binance DYDXUSDT 8h -0.10%
Lighter DYDX 8h +4.38%
OKX DYDX-USDT-SWAP 8h +6.33%
Aster DYDXUSDT 8h +10.95%
Bitget DYDXUSDT 8h +10.95%
Bybit DYDXUSDT 8h +10.95%
Hyperliquid DYDX 1h +10.95%

DYDX By venue →

Common questions

What is the Gate DYDX funding rate?

The latest collected Gate DYDX funding rate is -0.0201% per 8h rate period, or -22.01% simple annualised. At this rate shorts pay longs.

How often is funding charged on Gate DYDX?

The collected settlement interval is 8h, normally 3 times a day. Settlements fall at 00:00, 08:00 and 16:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Gate DYDX?

The collected leverage cap for Gate DYDX is 75x, with 18 margin tiers shown. The first margin tier, up to 10K USDT, allows 75x; the second allows 50x.

What is the maintenance margin rate on Gate DYDX?

The first tier requires 0.8333%, with 18 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Observation time and verification

This contract’s funding was observed at 2026-10-15 04:54 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology