English

Gate COTI perpetual

COTI_USDT

Use this contract in the calculator →

As of 2026-10-01 00:31 UTC, COTI_USDT on Gate has a collected rate of +0.0009% over 4h, or +1.97% simple annualised; its collected settlement interval is 4h, with up to 25x leverage. Binance has a lower rate for longs at -64.50%.

Rate
+0.0009%
Rate period: 4h
Annualised
+1.97%
348.7K 24h turnover
Max leverage
25x
17 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For COTI_USDT, 10,000 USDT of notional × 0.000900% gives 0.0900 USDT over the quoted 4h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for COTI_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 3.0000% maintenance margin.

Contract units and calculator input

One COTI_USDT contract represents 1 COTI. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 2.5000% 25.00x —
2 5000 – 7000 quote 3.0000% 22.00x 25
3 7000 – 10000 quote 3.5000% 20.00x 60
4 10000 – 15000 quote 4.0000% 18.00x 110
5 15000 – 20000 quote 5.0000% 15.00x 260
6 20000 – 30000 quote 5.5000% 14.00x 360
7 30000 – 50000 quote 6.0000% 12.00x 510
8 50000 – 70000 quote 6.5000% 11.00x 760
9 70000 – 100000 quote 7.0000% 10.00x 1110
10 100000 – 150000 quote 10.0000% 8.00x 4110
11 150000 – 200000 quote 15.0000% 5.00x 11610
12 200000 – 300000 quote 20.0000% 4.00x 21610
13 300000 – 500000 quote 28.0000% 3.00x 45610
14 500000 – 700000 quote 45.0000% 2.00x 130610
15 700000 – 1000000 quote 60.0000% 1.50x 235610
16 1000000 – 1500000 quote 78.0000% 1.20x 415610
17 1500000 – ∞ quote 90.0000% 1.05x 595610

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
COTI_USDT
Mark price
0.0132
Tick size
0.00001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Binance COTIUSDT 4h -64.50%
Bitget COTIUSDT 4h -64.17%
Aster COTIUSDT 4h -55.63%
Gate this page COTI_USDT 4h +1.97%
Bybit COTIUSDT 8h +10.95%

COTI By venue →

Common questions

What is the Gate COTI funding rate?

The latest collected Gate COTI funding rate is +0.0009% per 4h rate period, or +1.97% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate COTI?

The collected settlement interval is 4h, normally 6 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate COTI?

The collected leverage cap for Gate COTI is 25x, with 17 margin tiers shown. The first margin tier, up to 5K USDT, allows 25x; the second allows 22x.

What is the maintenance margin rate on Gate COTI?

The first tier requires 2.5000%, with 17 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Which venue has the lowest COTI funding cost for longs?

For a long position, Binance currently has the lowest rate at -64.50% annualised; this page's Gate is at +1.97%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

Observation time and verification

This contract’s funding was observed at 2026-10-01 00:31 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology