English

Bitget CFX perpetual

CFXUSDT

Use this contract in the calculator →

As of 2026-11-24 12:46 UTC, CFXUSDT on Bitget has a collected rate of -0.0173% over 8h, or -18.94% simple annualised; its collected settlement interval is 8h, with up to 75x leverage.

Rate
-0.0173%
Rate period: 8h
Annualised
-18.94%
173.1K 24h turnover
Max leverage
75x
9 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For CFXUSDT, 10,000 USDT of notional × -0.017300% gives 1.7300 USDT over the quoted 8h rate period: longs receive and shorts pay. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for CFXUSDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 10000 USDT. Above that, tier 2 requires 1.0000% maintenance margin.

Contract units and calculator input

One CFXUSDT contract represents 1 CFX. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsPerpetual max leverage and margin tiers compared across 8 venuesHow funding fees work: APR conversion, signs and settlement

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

No deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 10000 quote 0.6600% 75.00x —
2 10000 – 50000 quote 1.0000% 50.00x —
3 50000 – 75000 quote 2.5000% 25.00x —
4 75000 – 100000 quote 3.0000% 20.00x —
5 100000 – 175000 quote 5.0000% 10.00x —
6 175000 – 375000 quote 12.0000% 5.00x —
7 375000 – 850000 quote 15.0000% 4.00x —
8 850000 – 1550000 quote 30.0000% 2.00x —
9 1550000 – ∞ quote 60.0000% 1.00x —

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h (00:00 · 08:00 · 16:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
CFXUSDT
Mark price
0.0323
Tick size
0.00001
Lot size
1
Min notional
5

The same asset elsewhere

Venue Contract Rate period Annualised
Bitget this page CFXUSDT 8h -18.94%
Binance CFXUSDT 8h -9.92%
Bybit CFXUSDT 8h -6.10%
OKX CFX-USDT-SWAP 8h +8.24%
Aster CFXUSDT 8h +10.95%
Gate CFX_USDT 8h +10.95%
Hyperliquid CFX 1h +10.95%

CFX By venue →

Common questions

What is the Bitget CFX funding rate?

The latest collected Bitget CFX funding rate is -0.0173% per 8h rate period, or -18.94% simple annualised. At this rate shorts pay longs.

How often is funding charged on Bitget CFX?

The collected settlement interval is 8h, normally 3 times a day. Settlements fall at 00:00, 08:00 and 16:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Bitget CFX?

The collected leverage cap for Bitget CFX is 75x, with 9 margin tiers shown. The first margin tier, up to 10K USDT, allows 75x; the second allows 50x.

What is the maintenance margin rate on Bitget CFX?

The first tier requires 0.6600%, with 9 available tiers. The applicable requirement depends on the position’s tier. This venue applies no deduction: maintenance margin = notional × the rate of the tier the position falls in.

Observation time and verification

This contract’s funding was observed at 2026-11-24 12:46 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Bitget official data source · Funding methodology