English

Binance BTC perpetual

BTCUSDT

Use this contract in the calculator →

As of 2026-09-30 23:44 UTC, BTCUSDT on Binance has a collected rate of +0.0085% over 8h, or +9.27% simple annualised; its collected settlement interval is 8h, with up to 150x leverage. Aster has a lower rate for longs at -5.69%.

Rate
+0.0085%
Rate period: 8h
Annualised
+9.27%
14.8B 24h turnover
Max leverage
150x
12 Tier
30d realised APR
+5.69%
25 settlements

Settled rates over the past 30 days

Annualised · +5.69% · range -0.2% … +11.0% · 25 settlements

Settled funding for BTCUSDT

The latest 30-day window contains 25 settlements covering 200 known-period hours, with a cumulative rate of +0.1299%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-09-09 00:00+0.0049%8h
2026-09-08 16:00+0.0090%8h
2026-09-08 08:00+0.0082%8h
2026-09-08 00:00+0.0045%8h
2026-09-07 16:00+0.0022%8h
2026-09-07 08:00+0.0031%8h
2026-09-07 00:00+0.0028%8h
2026-09-06 16:00+0.0028%8h
2026-09-06 08:00+0.0023%8h
2026-09-06 00:00+0.0036%8h
2026-09-05 16:00+0.0019%8h
2026-09-05 08:00-0.0002%8h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For BTCUSDT, 10,000 USDT of notional × 0.008463% gives 0.8463 USDT over the quoted 8h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for BTCUSDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 300000 USDT. Above that, tier 2 requires 0.5000% maintenance margin.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 300000 quote 0.4000% 150.00x —
2 300000 – 800000 quote 0.5000% 100.00x 300
3 800000 – 3000000 quote 0.6500% 75.00x 1500
4 3000000 – 12000000 quote 1.0000% 50.00x 12000
5 12000000 – 70000000 quote 2.0000% 25.00x 132000
6 70000000 – 100000000 quote 2.5000% 20.00x 482000
7 100000000 – 230000000 quote 5.0000% 10.00x 2982000
8 230000000 – 480000000 quote 10.0000% 5.00x 14482000
9 480000000 – 600000000 quote 12.5000% 4.00x 26482000
10 600000000 – 800000000 quote 15.0000% 3.00x 41482000
11 800000000 – 1200000000 quote 25.0000% 2.00x 121482000
12 1200000000 – 1800000000 quote 50.0000% 1.00x 421482000

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
BTCUSDT
Mark price
83583.7000
Tick size
0.1
Lot size
0.001
Min notional
50

The same asset elsewhere

Venue Contract Rate period Annualised
Aster BTCU 8h -5.69%
Lighter BTC 8h -3.50%
Aster BTCUSD1 8h +4.16%
Bybit BTCUSDT 8h +4.60%
OKX BTC-USDT-SWAP 8h +5.75%
Binance BTCU 8h +6.24%
Binance BTCUSDC 8h +7.82%
Binance this page BTCUSDT 8h +9.27%
Bybit BTCPERP 8h +9.84%
Gate BTC_USDT 8h +9.96%
Aster BTCUSDT 8h +10.95%
Binance BTCUSD1 8h +10.95%
Bitget BTCUSDT 8h +10.95%
Hyperliquid BTC 1h +10.95%
OKX BTC-USD-SWAP 8h +10.95%

BTC By venue →

Common questions

What is the Binance BTC funding rate?

The latest collected Binance BTC funding rate is +0.0085% per 8h rate period, or +9.27% simple annualised. At this rate longs pay shorts.

How often is funding charged on Binance BTC?

The collected settlement interval is 8h, normally 3 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Binance BTC?

The collected leverage cap for Binance BTC is 150x, with 12 margin tiers shown. The first margin tier, up to 300K USDT, allows 150x; the second allows 100x.

What is the maintenance margin rate on Binance BTC?

The first tier requires 0.4000%, with 12 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Which venue has the lowest BTC funding cost for longs?

For a long position, Aster currently has the lowest rate at -5.69% annualised; this page's Binance is at +9.27%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

What has Binance BTC funding paid over the past 30 days?

Settlements over the past 30 days annualise to +5.69% across 25 settlements, 4% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-09-30 23:44 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Binance official data source · Funding methodology

History coverage for this contract

25 settlements are available, covering 200 known-period hours, from 2026-09-01 00:00 to 2026-09-09 00:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.