English

Gate BCH perpetual

BCH_USDT

Use this contract in the calculator →

As of 2026-09-30 23:44 UTC, BCH_USDT on Gate has a collected rate of +0.0082% over 8h, or +8.98% simple annualised; its collected settlement interval is 8h, with up to 75x leverage. OKX has a lower rate for longs at +4.38%.

Rate
+0.0082%
Rate period: 8h
Annualised
+8.98%
7.9M 24h turnover
Max leverage
75x
17 Tier
30d realised APR
+4.35%
25 settlements

Settled rates over the past 30 days

Annualised · +4.35% · range -9.9% … +11.0% · 25 settlements

Settled funding for BCH_USDT

The latest 30-day window contains 25 settlements covering 200 known-period hours, with a cumulative rate of +0.0993%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-09-09 00:00+0.0036%8h
2026-09-08 16:00+0.0036%8h
2026-09-08 08:00+0.0038%8h
2026-09-08 00:00+0.0005%8h
2026-09-07 16:00+0.0059%8h
2026-09-07 08:00+0.0100%8h
2026-09-07 00:00+0.0002%8h
2026-09-06 16:00+0.0011%8h
2026-09-06 08:00+0.0093%8h
2026-09-06 00:00+0.0100%8h
2026-09-05 16:00+0.0085%8h
2026-09-05 08:00+0.0100%8h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For BCH_USDT, 10,000 USDT of notional × 0.008200% gives 0.8200 USDT over the quoted 8h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for BCH_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 50000 USDT. Above that, tier 2 requires 0.8000% maintenance margin.

Contract units and calculator input

One BCH_USDT contract represents 0.01 BCH. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 50000 quote 0.7000% 75.00x —
2 50000 – 70000 quote 0.8000% 60.00x 50
3 70000 – 100000 quote 1.0000% 50.00x 190
4 100000 – 150000 quote 1.5000% 40.00x 690
5 150000 – 200000 quote 1.6000% 35.00x 840
6 200000 – 300000 quote 1.7000% 30.00x 1040
7 300000 – 500000 quote 1.8000% 28.00x 1340
8 500000 – 1000000 quote 2.0000% 25.00x 2340
9 1000000 – 2000000 quote 2.2000% 22.00x 4340
10 2000000 – 5000000 quote 2.5000% 20.00x 10340
11 5000000 – 10000000 quote 3.3000% 15.00x 50340
12 10000000 – 15000000 quote 5.0000% 10.00x 220340
13 15000000 – 20000000 quote 7.7000% 6.60x 625340
14 20000000 – 30000000 quote 10.0000% 5.00x 1085340
15 30000000 – 50000000 quote 18.0000% 3.00x 3485340
16 50000000 – 70000000 quote 25.0000% 2.00x 6985340
17 70000000 – ∞ quote 50.0000% 1.05x 24485340

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
BCH_USDT
Mark price
306.1700
Tick size
0.01
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
OKX BCH-USDT-SWAP 8h +4.38%
Gate this page BCH_USDT 8h +8.98%
Bybit BCHUSDT 8h +9.34%
Lighter BCH 8h +10.51%
Aster BCHUSDT 8h +10.95%
Binance BCHUSDC 8h +10.95%
Binance BCHUSDT 8h +10.95%
Bitget BCHUSDT 8h +10.95%
Bybit BCHPERP 4h +10.95%
Hyperliquid BCH 1h +10.95%
OKX BCH-USD-SWAP 8h +10.95%

BCH By venue →

Common questions

What is the Gate BCH funding rate?

The latest collected Gate BCH funding rate is +0.0082% per 8h rate period, or +8.98% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate BCH?

The collected settlement interval is 8h, normally 3 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate BCH?

The collected leverage cap for Gate BCH is 75x, with 17 margin tiers shown. The first margin tier, up to 50K USDT, allows 75x; the second allows 60x.

What is the maintenance margin rate on Gate BCH?

The first tier requires 0.7000%, with 17 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Which venue has the lowest BCH funding cost for longs?

For a long position, OKX currently has the lowest rate at +4.38% annualised; this page's Gate is at +8.98%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

What has Gate BCH funding paid over the past 30 days?

Settlements over the past 30 days annualise to +4.35% across 25 settlements, 20% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-09-30 23:44 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology

History coverage for this contract

25 settlements are available, covering 200 known-period hours, from 2026-09-01 00:00 to 2026-09-09 00:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.