English

Gate BAN perpetual

BAN_USDT

Use this contract in the calculator →

As of 2026-10-15 04:54 UTC, BAN_USDT on Gate has a collected rate of +0.0100% over 8h, or +10.95% simple annualised; its collected settlement interval is 8h, with up to 20x leverage.

Rate
+0.0100%
Rate period: 8h
Annualised
+10.95%
128.2K 24h turnover
Max leverage
20x
17 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For BAN_USDT, 10,000 USDT of notional × 0.010000% gives 1.0000 USDT over the quoted 8h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for BAN_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 5000 USDT. Above that, tier 2 requires 4.0000% maintenance margin.

Contract units and calculator input

One BAN_USDT contract represents 10 BAN. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 3.5000% 20.00x —
2 5000 – 10000 quote 4.0000% 18.00x 25
3 10000 – 20000 quote 4.5000% 15.00x 75
4 20000 – 30000 quote 5.0000% 12.00x 175
5 30000 – 50000 quote 6.5000% 10.00x 625
6 50000 – 100000 quote 8.0000% 8.00x 1375
7 100000 – 150000 quote 10.0000% 7.00x 3375
8 150000 – 200000 quote 12.0000% 6.00x 6375
9 200000 – 300000 quote 15.0000% 5.00x 12375
10 300000 – 500000 quote 20.0000% 4.00x 27375
11 500000 – 1000000 quote 24.0000% 3.50x 47375
12 1000000 – 1500000 quote 28.0000% 3.00x 87375
13 1500000 – 2000000 quote 35.0000% 2.50x 192375
14 2000000 – 2500000 quote 45.0000% 2.00x 392375
15 2500000 – 3000000 quote 60.0000% 1.50x 767375
16 3000000 – 4000000 quote 78.0000% 1.20x 1307375
17 4000000 – ∞ quote 90.0000% 1.05x 1787375

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h (00:00 · 08:00 · 16:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
BAN_USDT
Mark price
0.0517
Tick size
0.00001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Bitget BANUSDT 4h +10.95%
Bybit BANUSDT 4h +10.95%
Gate this page BAN_USDT 8h +10.95%
Binance BANUSDT 4h +26.52%
Aster BANUSDT 4h +51.77%

BAN By venue →

Common questions

What is the Gate BAN funding rate?

The latest collected Gate BAN funding rate is +0.0100% per 8h rate period, or +10.95% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate BAN?

The collected settlement interval is 8h, normally 3 times a day. Settlements fall at 00:00, 08:00 and 16:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Gate BAN?

The collected leverage cap for Gate BAN is 20x, with 17 margin tiers shown. The first margin tier, up to 5K USDT, allows 20x; the second allows 18x.

What is the maintenance margin rate on Gate BAN?

The first tier requires 3.5000%, with 17 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Observation time and verification

This contract’s funding was observed at 2026-10-15 04:54 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology