English

Aster AXS perpetual

AXSUSDT

Use this contract in the calculator →

As of 2026-10-05 05:39 UTC, AXSUSDT on Aster has a collected rate of +0.0050% over 4h, or +10.95% simple annualised; its collected settlement interval is 4h, with up to 10x leverage. Bybit has a lower rate for longs at -51.40%.

Rate
+0.0050%
Rate period: 4h
Annualised
+10.95%
163.7K 24h turnover
Max leverage
10x
6 Tier

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade

What does this rate mean for a 10,000 USDT position?

For AXSUSDT, 10,000 USDT of notional × 0.005000% gives 0.5000 USDT over the quoted 4h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for AXSUSDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 500000 USDT. Above that, tier 2 requires 10.0000% maintenance margin.

Further readingHow liquidation price is calculated: tiered maintenance margin and deductionsHow funding fees work: amounts, signs and settlement

Settled history is not currently available for this contract. The latest funding snapshot cannot establish the actual funding cost over the past 30 days.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 500000 quote 5.0000% 10.00x —
2 500000 – 1000000 quote 10.0000% 5.00x 25000
3 1000000 – 2500000 quote 12.5000% 4.00x 50000
4 2500000 – 5000000 quote 16.6700% 3.00x 154250
5 5000000 – 10000000 quote 25.0000% 2.00x 570750
6 10000000 – 1000000000 quote 50.0000% 1.00x 3070750

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 4h (00:00 · 04:00 · 08:00 · 12:00 · 16:00 · 20:00 UTC). Lot size uses the venue’s original order unit; the calculator takes base-asset quantity. Settlement intervals and times on every venue.

Contract
AXSUSDT
Mark price
1.3113
Tick size
0.0001
Lot size
1
Min notional
5

The same asset elsewhere

Venue Contract Rate period Annualised
Bybit AXSUSDT 8h -51.40%
OKX AXS-USDT-SWAP 4h -14.29%
Gate AXS_USDT 8h -9.96%
Binance AXSUSDT 4h -0.89%
Lighter AXS 8h +10.51%
Aster this page AXSUSDT 4h +10.95%
Bitget AXSUSDT 4h +10.95%
Hyperliquid AXS 1h +10.95%

AXS By venue →

Common questions

What is the Aster AXS funding rate?

The latest collected Aster AXS funding rate is +0.0050% per 4h rate period, or +10.95% simple annualised. At this rate longs pay shorts.

How often is funding charged on Aster AXS?

The collected settlement interval is 4h, normally 6 times a day. Settlements fall at 00:00, 04:00, 08:00, 12:00, 16:00 and 20:00 UTC, the same times in UTC+8. Venues can change it again; confirm the next settlement time on the venue's contract page.

What is the maximum leverage on Aster AXS?

The collected leverage cap for Aster AXS is 10x, with 6 margin tiers shown. The first margin tier, up to 500K USDT, allows 10x; the second allows 5x.

What is the maintenance margin rate on Aster AXS?

The first tier requires 5.0000%, with 6 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Which venue has the lowest AXS funding cost for longs?

For a long position, Bybit currently has the lowest rate at -51.40% annualised; this page's Aster is at +10.95%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

Observation time and verification

This contract’s funding was observed at 2026-10-05 05:39 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Aster official data source · Funding methodology