English

Gate ARB perpetual

ARB_USDT

Use this contract in the calculator →

As of 2026-10-01 00:31 UTC, ARB_USDT on Gate has a collected rate of +0.0092% over 8h, or +10.07% simple annualised; its collected settlement interval is 8h, with up to 50x leverage. Bybit has a lower rate for longs at -5.43%.

Rate
+0.0092%
Rate period: 8h
Annualised
+10.07%
6.5M 24h turnover
Max leverage
50x
16 Tier
30d realised APR
+3.34%
24 settlements

Settled rates over the past 30 days

Annualised · +3.34% · range -14.1% … +11.0% · 24 settlements

Settled funding for ARB_USDT

The latest 30-day window contains 24 settlements covering 192 known-period hours, with a cumulative rate of +0.0733%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-09-09 00:00-0.0036%8h
2026-09-08 16:00+0.0100%8h
2026-09-08 08:00+0.0027%8h
2026-09-08 00:00-0.0120%8h
2026-09-07 16:00-0.0117%8h
2026-09-07 08:00+0.0034%8h
2026-09-07 00:00-0.0057%8h
2026-09-06 16:00+0.0077%8h
2026-09-06 08:00+0.0064%8h
2026-09-06 00:00+0.0100%8h
2026-09-05 16:00-0.0003%8h
2026-09-05 08:00+0.0038%8h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For ARB_USDT, 10,000 USDT of notional × 0.009200% gives 0.9200 USDT over the quoted 8h rate period: longs pay and shorts receive. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for ARB_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 50000 USDT. Above that, tier 2 requires 1.5000% maintenance margin.

Contract units and calculator input

One ARB_USDT contract represents 1 ARB. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 50000 quote 1.0000% 50.00x —
2 50000 – 100000 quote 1.5000% 40.00x 250
3 100000 – 150000 quote 2.0000% 30.00x 750
4 150000 – 200000 quote 2.5000% 25.00x 1500
5 200000 – 300000 quote 3.0000% 20.00x 2500
6 300000 – 500000 quote 3.5000% 18.00x 4000
7 500000 – 700000 quote 4.0000% 15.00x 6500
8 700000 – 1000000 quote 5.0000% 12.00x 13500
9 1000000 – 1500000 quote 8.0000% 10.00x 43500
10 1500000 – 2000000 quote 11.0000% 7.00x 88500
11 2000000 – 3000000 quote 15.0000% 5.00x 168500
12 3000000 – 4000000 quote 28.0000% 3.00x 558500
13 4000000 – 5000000 quote 45.0000% 2.00x 1238500
14 5000000 – 7000000 quote 60.0000% 1.50x 1988500
15 7000000 – 10000000 quote 78.0000% 1.20x 3248500
16 10000000 – ∞ quote 90.0000% 1.05x 4448500

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
ARB_USDT
Mark price
0.2021
Tick size
0.00001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Bybit ARBUSDT 8h -5.43%
Binance ARBUSDT 8h +5.09%
OKX ARB-USDT-SWAP 8h +5.95%
Lighter ARB 8h +7.01%
Gate this page ARB_USDT 8h +10.07%
Aster ARBUSDT 8h +10.95%
Binance ARBUSDC 8h +10.95%
Bitget ARBUSDT 8h +10.95%
Bybit ARBPERP 8h +10.95%
Hyperliquid ARB 1h +10.95%

ARB By venue →

Common questions

What is the Gate ARB funding rate?

The latest collected Gate ARB funding rate is +0.0092% per 8h rate period, or +10.07% simple annualised. At this rate longs pay shorts.

How often is funding charged on Gate ARB?

The collected settlement interval is 8h, normally 3 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate ARB?

The collected leverage cap for Gate ARB is 50x, with 16 margin tiers shown. The first margin tier, up to 50K USDT, allows 50x; the second allows 40x.

What is the maintenance margin rate on Gate ARB?

The first tier requires 1.0000%, with 16 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

Which venue has the lowest ARB funding cost for longs?

For a long position, Bybit currently has the lowest rate at -5.43% annualised; this page's Gate is at +10.07%. Negative funding pays longs. Trading costs are excluded, and the cash-flow direction reverses for shorts.

What has Gate ARB funding paid over the past 30 days?

Settlements over the past 30 days annualise to +3.34% across 24 settlements, 29% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-10-01 00:31 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology

History coverage for this contract

24 settlements are available, covering 192 known-period hours, from 2026-09-01 08:00 to 2026-09-09 00:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.