English

Gate APT perpetual

APT_USDT

Use this contract in the calculator →

As of 2026-10-01 00:31 UTC, APT_USDT on Gate has a collected rate of -0.0108% over 8h, or -11.83% simple annualised; its collected settlement interval is 8h, with up to 75x leverage.

Rate
-0.0108%
Rate period: 8h
Annualised
-11.83%
2.6M 24h turnover
Max leverage
75x
20 Tier
30d realised APR
+3.15%
24 settlements

Settled rates over the past 30 days

Annualised · +3.15% · range -27.0% … +11.0% · 24 settlements

Settled funding for APT_USDT

The latest 30-day window contains 24 settlements covering 192 known-period hours, with a cumulative rate of +0.0690%. The latest 12 settlements are shown below.

Settlement time (UTC)RateRate period
2026-09-09 00:00+0.0100%8h
2026-09-08 16:00+0.0088%8h
2026-09-08 08:00+0.0100%8h
2026-09-08 00:00+0.0100%8h
2026-09-07 16:00+0.0100%8h
2026-09-07 08:00-0.0018%8h
2026-09-07 00:00+0.0070%8h
2026-09-06 16:00+0.0100%8h
2026-09-06 08:00-0.0059%8h
2026-09-06 00:00-0.0105%8h
2026-09-05 16:00+0.0100%8h
2026-09-05 08:00+0.0100%8h

The cumulative rate sums actual settlements with known periods. Positive totals mean net payment by longs and receipt by shorts; negative totals reverse the direction. If notional value changed, multiplying the current position by this total will not reproduce account cash flows. Historical rates do not predict returns.

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Trade →

What does this rate mean for a 10,000 USDT position?

For APT_USDT, 10,000 USDT of notional × -0.010800% gives 1.0800 USDT over the quoted 8h rate period: longs receive and shorts pay. This is a constant-rate illustration, not a settled bill or a forecast. Use the actual settlement rate and notional at each settlement; leverage is not multiplied again. Trading fees are separate.

How do I select the margin tier for APT_USDT?

This table selects tiers by position notional in USDT, not by the amount of margin deposited. The first tier starts at 0 and ends at 10000 USDT. Above that, tier 2 requires 0.9000% maintenance margin.

Contract units and calculator input

One APT_USDT contract represents 0.1 APT. Order lot size is expressed in the venue’s original unit. The liquidation calculator expects base-asset quantity; do not enter a contract count without converting units.

Maintenance margin ladder

With deduction · An isolated-margin estimate for linear contracts; excludes closing fees, accrued funding, auto-added margin and other positions.

Tier Range Maintenance rate Max leverage Deduction
1 0 – 10000 quote 0.8333% 75.00x —
2 10000 – 20000 quote 0.9000% 60.00x 6.67
3 20000 – 30000 quote 1.0000% 50.00x 26.67
4 30000 – 50000 quote 1.1000% 40.00x 56.67
5 50000 – 70000 quote 1.2000% 35.00x 106.67
6 70000 – 100000 quote 1.3000% 33.00x 176.67
7 100000 – 200000 quote 1.5000% 30.00x 376.67
8 200000 – 300000 quote 1.8000% 25.00x 976.67
9 300000 – 500000 quote 2.5000% 20.00x 3076.67
10 500000 – 700000 quote 3.0000% 16.00x 5576.67
11 700000 – 1000000 quote 4.0000% 12.00x 12576.67
12 1000000 – 1500000 quote 6.0000% 8.00x 32576.67
13 1500000 – 2000000 quote 10.0000% 5.00x 92576.67
14 2000000 – 3000000 quote 15.0000% 4.00x 192576.67
15 3000000 – 5000000 quote 20.0000% 3.00x 342576.67
16 5000000 – 7000000 quote 30.0000% 2.00x 842576.67
17 7000000 – 10000000 quote 40.0000% 1.80x 1542576.67
18 10000000 – 15000000 quote 50.0000% 1.50x 2542576.67
19 15000000 – 20000000 quote 60.0000% 1.20x 4042576.67
20 20000000 – ∞ quote 80.0000% 1.05x 8042576.67

Contract specification

Quote currency: USDT · Settlement currency: USDT · Settlement interval: 8h. Lot size uses the venue’s original order unit; the calculator takes base-asset quantity.

Contract
APT_USDT
Mark price
0.7783
Tick size
0.0001
Lot size
1

The same asset elsewhere

Venue Contract Rate period Annualised
Gate this page APT_USDT 8h -11.83%
Binance APTUSDT 8h -9.31%
OKX APT-USDT-SWAP 8h +1.02%
Bybit APTUSDT 8h +3.79%
Lighter APT 8h +10.51%
Aster APTUSDT 8h +10.95%
Bitget APTUSDT 8h +10.95%
Hyperliquid APT 1h +10.95%

APT By venue →

Common questions

What is the Gate APT funding rate?

The latest collected Gate APT funding rate is -0.0108% per 8h rate period, or -11.83% simple annualised. At this rate shorts pay longs.

How often is funding charged on Gate APT?

The collected settlement interval is 8h, normally 3 times a day. Venues can change it; confirm the next settlement time on the contract page.

What is the maximum leverage on Gate APT?

The collected leverage cap for Gate APT is 75x, with 20 margin tiers shown. The first margin tier, up to 10K USDT, allows 75x; the second allows 60x.

What is the maintenance margin rate on Gate APT?

The first tier requires 0.8333%, with 20 available tiers. The applicable requirement depends on the position’s tier. This venue applies a deduction: maintenance margin = notional × tier rate − the tier's maintenance amount.

What has Gate APT funding paid over the past 30 days?

Settlements over the past 30 days annualise to +3.15% across 24 settlements, 29% of which were negative (shorts paying). That is what already happened, not a forecast.

Observation time and verification

This contract’s funding was observed at 2026-10-01 00:31 UTC; an unsettled quote may still change. A dash denotes missing usable data, not zero. Gate official data source · Funding methodology

History coverage for this contract

24 settlements are available, covering 192 known-period hours, from 2026-09-01 08:00 to 2026-09-09 00:00 UTC. Annualisation uses those covered hours; a full 30-day record is not implied.