English

GIGADEV perpetuals

Compare funding costs for one asset across venues.

Data as of 2026-11-04 07:43 UTC

GIGADEV is quoted on 2 contracts. The highest funding rate is on Gate at +51.68% annualised, quoted per 8h, and the lowest is on OKX at 0.00% — a gap of 51.68 points. Every contract here quotes its rate per 8h.

Highest rate now
+51.68%
Gate · 8h
Lowest rate now
0.00%
OKX · 8h
Spread
51.68
points
Highest 30d realised APR
+88.44%
OKX

By venue

Venue Rate Annualised 30d realised APR Max leverage 24h turnover Actions
GateCentralisedGIGADEV_USDT +0.0472%8h +51.68% —
no history yet
20x 176.2K
OKXCentralisedGIGADEV-USDT-SWAP 0.0000%8h 0.00% +88.44%
Annualised · +88.44% · range -11.8% … +391.1% · 13 settlements
20x 1.4M

Common questions

Which exchanges list GIGADEV perpetual futures?

GIGADEV trades as 2 perpetual contracts across 2 venues: Gate and OKX. The busiest is OKX, with $1.4M of 24h turnover — 89% of the total.

Where is GIGADEV funding cheapest right now?

For a long, the most favourable collected rate is 0.00% annualised on OKX; for a short, it is +51.68% on Gate — a gap of 51.68 points.

How much funding does a 10,000 USDT GIGADEV position pay per day?

At current rates a 10,000 USDT long pays about +14.16 USDT a day on Gate and 0.00 USDT on OKX.

How often does GIGADEV funding settle?

Every venue collected here settles GIGADEV funding every 8h, 3 times a day.

What is the highest leverage available on GIGADEV?

The highest collected cap is 20x, on Gate and OKX. On Gate it applies up to 5K USDT of notional; above that the cap drops to 16x.

Further readingCross-venue funding spreads: from gross rates to net P&LHow funding fees work: amounts, signs and settlementHow liquidation price is calculated: tiered maintenance margin and deductions

GIGADEV comparison scope and payment direction

This page retains low-turnover GIGADEV contracts without the main ranking’s $1M threshold. Positive funding is paid by longs; negative funding is paid by shorts. High and low are rate values, not recommendations. Annualisation method · Official sources.

Rates and chart methodology

Annualised over the window sums what actually settled on that contract, then extrapolates across the hours those settlements covered — it is not today's rate projected forward. A contract listed less than 30 days ago is extrapolated from its own span. The grey line is zero: above it longs pay, below it shorts pay. Every row in that column shares one vertical scale, so their swings can be compared directly.

Trading link disclosure

Affiliate disclosure: We may earn a commission if you register and trade through some links. Partnerships do not influence the data displayed or rankings.

Margin ladders

Gate · GIGADEV_USDT With deduction

Tier Range Maintenance rate Max leverage Deduction
1 0 – 5000 quote 2.5000% 20.00x —
2 5000 – 10000 quote 3.0000% 16.00x 25
3 10000 – 20000 quote 3.5000% 14.00x 75
4 20000 – 30000 quote 4.0000% 12.00x 175
5 30000 – 50000 quote 5.0000% 10.00x 475
6 50000 – 70000 quote 6.5000% 8.00x 1225
7 70000 – 100000 quote 8.0000% 6.00x 2275
8 100000 – 200000 quote 10.0000% 5.00x 4275
9 200000 – 300000 quote 15.0000% 4.00x 14275
10 300000 – 500000 quote 20.0000% 3.00x 29275
11 500000 – 1000000 quote 25.0000% 2.00x 54275
12 1000000 – 1500000 quote 40.0000% 1.50x 204275
13 1500000 – ∞ quote 70.0000% 1.05x 654275